NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Final Status Rept, "Phase 1 Elkem Metals Bldg 78 SDMP Site," which indicates that all outdoor areas are remediated to NRC criteria.Meeting to discuss rept content & future actions,requested.

Accession Number: ML20140G725

Date Released: Monday, October 28, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer