Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for documents re C-E auxiliary pressurizer spray sys at plants & any ACRS discussions.App A documents available in PDR.Forwards App B documents.Search for addl documents continuing.
Accession Number: ML20140B723
Date Released: Tuesday, June 2, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20140G753 - Partial response to FOIA request for documents re C-E auxiliary pressurizer spray sys at plants & any ACRS discussions.App A documents available in PDR.Forwards App B documents.Search for addl documents continuing. (7 page(s), 3/11/1986)
- ML20140G793 - Forwards 850806 & 0730 ltrs & Insp Rept 50-528/85-12 per ACRS 811215 request for info re startup experience on Unit 1 prior to loading on Unit 2.Unit 2 fuel load scheduled for Nov.Initial criticality expected by Jan 1986. (3 page(s), 9/25/1985)
- ML20140G803 - Requests set of questions/issues for consideration as discussion topics at upcoming ACRS C-E Subcommittee meeting as result of ACRS 302nd meeting re DHR sys & rapid depressurization capability. (1 page(s), 6/13/1985)
- ML20140B717 - Summary of 810917 meeting w/C-E in Bethesda,MD re staff positions on accident & transient analyses for facility. (15 page(s), 10/6/1981)
- ML20140G762 - Notifies of ACRS Palo Verde Nuclear Generating Station Subcommittee 850426 meeting in Wintersberg,AZ to review final repts for various const deficiencies & results of preoperational testing. (2 page(s), 4/18/1985)
- ML20140H569 - Staff requirements memo re 850903 briefing in Washington,DC on near-term OLs.ACRS requested to provide updated position on prior to anticipated low power or full power OL decision, if ACRS view differs from 811215 rept. (1 page(s), 9/7/1985)
- ML20140G771 - Discusses four items needing resolution & requiring rept to ACRS as prerequisites to proposed operation of plant at full power. (3 page(s), 6/5/1985)
- ML20140G757 - Requests rept describing significant const deficiencies & disposition,effectiveness of QA program & results of preoperational test program prior to Unit 1 fuel loading. (2 page(s), 8/31/1984)
- ML20140G822 - Requests publication of encl FR notice of ACRS Subcommittee on Palo Verde/C-E Reactors 851105 meeting by 851028. (1 page(s), 10/25/1985)
- ML20140G786 - Forwards proposed meeting summary & working copy of minutes for ACRS Palo Verde Nuclear Station Subcommittee 850426 meeting in Wintersberg,AZ. (4 page(s), 5/6/1985)
- ML20140G795 - Advises that util projected 851101 as probable date for low power license & fuel load at Unit 2.Future subcommittee activity on plant should be discussed during ACRS 850912-14 meetings. (2 page(s), 9/4/1985)
- ML20140G781 - Provides evaluations from ACRS Palo Verde Subcommittee 850426 meeting.Minutes of ACRS 292nd 840809-11 meetings encl. (12 page(s), 5/6/1985)
- ML20140G813 - Forwards morning rept discussing 850912 planned load rejection test w/reactor power level at 55%.Test resulted in unanticipated sequence of turbine trip,bus failure,reactor trip & safety injection.Event being reviewed. (29 page(s), 9/23/1985)
- ML20140G818 - Forwards proposed agenda items for ACRS C-E/Palo Verde Subcommittee 851105 meeting. (3 page(s), 10/15/1985)
- ML20140G798 - Forwards review of operating experience for startup.No significant problems re reactor sys & instrumentation reported.Seven LERs initiated since initial criticality. (20 page(s), 7/30/1985)
- ML20140G828 - Notice of ACRS Subcommittee on Palo Verde/C-E Reactors 851105 meeting in Washington,DC. (2 page(s), 10/25/1985)
- ML20140G806 - Provides updated position prior to low power or full power license in response to S Chilk 850917 memo. (4 page(s), 10/9/1985)
- ML20140G834 - Notifies of ACRS Combined C-E Plants/Palo Verde Subcommittee 851105 meeting in Washington,DC to review util test program, including recent transient events.Related info encl. (22 page(s), 10/30/1985)
- ML20140G809 - Forwards 850825 morning rept on tube rupture & steam line breaks.Incident may indicate need for ACRS to reflect further on proposed primary blowdown concepts for PWRs. Viewgraphs encl. (18 page(s), 9/11/1985)