Home > NRC Library > ADAMS Public Documents
Forwards Tests 28B, "Recirculation Pump Trip Test," & 28D, "Recirculation Pump Runback Test," per attached power ascension test mods,for expedited review.Safety evaluation & marked-up FSAR pages also encl.
Accession Number: ML20139A279
Date Released: Monday, June 1, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20139A274 - Forwards Tests 28B, "Recirculation Pump Trip Test," & 28D, "Recirculation Pump Runback Test," per attached power ascension test mods,for expedited review.Safety evaluation & marked-up FSAR pages also encl. (3 page(s), 10/4/1985)
- ML20139A288 - Test 28B, "Recirculation Pump Trip - Two Pumps in Conjunction W/Test 25." (3 page(s), 10/1/1985)
- ML20139A310 - "Deletion of Test Number 28B,Two Pump Recirculation Pump Trip Test at Test Condition 3," safety evaluation. (8 page(s), 10/1/1985)