Home > NRC Library > ADAMS Public Documents
Further response to FOIA request for documents re Comanche Peak Task Force established in Mar 1984.Forwards App A documents.Documents also available in PDR.App A documents not encl undergoing further review.
Accession Number: ML20138M609
Date Released: Wednesday, June 3, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20138M606 - Further response to FOIA request for documents re Comanche Peak Task Force established in Mar 1984.Forwards App A documents.Documents also available in PDR.App A documents not encl undergoing further review. (8 page(s), 10/16/1985)
- ML20138M811 - Rev 3 to Instruction QI-QP-11.4-9, "Insp of Shop Primed Equipment." (3 page(s), 9/3/1982)
- ML20138P143 - Rev 0 to Procedure CP-QP-11.5, "General Procedure for Random Insp." (3 page(s), 12/19/1979)
- ML20138P014 - "LOCA Amercoat D-6/Phenoline 305 Finish & Comanche Peak LOCA FSAR Curve," final rept. (6 page(s), 4/11/1978)
- ML20138M794 - Rev 7 to Procedure CP-QP-11.4, "Insp of Protective Coatings." (2 page(s), 11/8/1983)
- ML20138P403 - Rev 7 to Const Procedure CCP-40, "Protective Coating of Concrete Surfaces," incorporating Document Change Notices 1-3. (27 page(s), 6/27/1984)
- ML20138P613 - Rev 5 to Const Procedure CCP-40 re surface preparation & coating of cementitious surfaces inside reactor bldg & radiation area,incorporating Document Change Notice 1-6. (24 page(s), 10/14/1983)
- ML20138P127 - Rev 3 to Procedure CP-QP-11.0, "Civil Insp Activities." (3 page(s), 9/15/1983)
- ML20138M892 - Revised procedures,including Revs 5-13,17,18,20-22 & 24-26 to Instruction QI-QP-11.4-5, "Insp of Steel Substrate Primer Repair & Seal & Finish Coat Application & Repair. (86 page(s), 10/24/1983)
- ML20138P325 - Rev 5 to Const Procedure CCP 40, "Protective Coatings of Concrete Surfaces," Attachment S, "Special Coatings Procedure C-1, 'Application of Nutec 10 Concrete Curing & Sealing Compound.'" (14 page(s), 10/14/1983)
- ML20138P098 - Rev 5 to Procedure CP-QP-6.0, "Preparation of Quality Procedures & Instructions." (14 page(s), 4/27/1984)
- ML20138P177 - Rev 0 to Procedure CP-QP-19.4, "Tack Weld Surveillance." (3 page(s), 7/6/1981)
- ML20138N708 - "Test Program to Evaluate DBA Performance of Overlaps Coating Sys (Carboline/Imperial) for Beaver Valley Unit 2." (133 page(s), 12/24/1981)
- ML20138P265 - Rev 20 to Procedure CP-QP-18.0, "Insp Rept." (24 page(s), 8/9/1984)
- ML20138M800 - Rev 1 to Instruction QI-QP-11.4-8, "Insp of Special Coating Operations." (5 page(s), 7/26/1979)
- ML20138P268 - Rev 1 to Instruction CP-EI-4.0-51, "Control of Protective Coatings Field Verification Activities." Related info encl. (19 page(s), 4/6/1984)
- ML20138P342 - Rev 2 to Procedure CP-CPM-5.1, "Field Procurement Activities." (16 page(s), 9/12/1979)
- ML20138P508 - Draft "BNL Comanche Peak Steam Electric Station Technical Review Team Audit Plan for Area II DBA Testing." (29 page(s), 7/31/1984)
- ML20138P150 - Rev 3 to Procedure CP-QP-11.10, "Insp of Electrical/Raceway Support Sys." (3 page(s), 8/7/1984)
- ML20138N697 - Forwards repts re irradiation,decontamination & DBA testing, per request of Y Korobov of Carboline Co. (14 page(s), 9/18/1984)
- ML20138P125 - Rev 226 to Procedure CP-QP-0.1, "Quality Procedures Manual: Table of Contents." (5 page(s), 8/24/1984)
- ML20138P519 - Draft "BNL Comanche Peak Steam Electric Station Technical Review Team Audit Plan for Area IV Procedures." (30 page(s), 7/31/1984)
- ML20138P529 - Draft "BNL Comanche Peak Steam Electric Station Technical Review Team Audit Plan for Area V Training." (12 page(s), 7/31/1984)
- ML20138P537 - Draft "BNL Comanche Peak Steam Electric Station Technical Review Team Audit Plan for Area VI Nonconformance Reporting." (8 page(s), 7/31/1984)
- ML20138P239 - Rev 2 to Procedure CP-QP-15.3, "Quality Engineering Review of Startup Work Permits." (3 page(s), 1/6/1984)
- ML20138P208 - Rev 4 to Procedure CP-QP-11.15, "Permanent Equipment Transfer Verification." (4 page(s), 9/19/1983)
- ML20138M964 - Rev 6 to Instruction QI-QP-2.1-4, "Qualification of Protective Coating Insp Personnel." (13 page(s), 7/28/1983)
- ML20138M959 - Rev 2 to Instruction QI-QP-2.1-16, "Qualification of Design Change Verification Personnel." (6 page(s), 7/28/1983)
- ML20138N681 - Advises of error in 840417 ltr.Total size estimates for concrete should be 285,000.Related info encl. (14 page(s), 4/23/1984)
- ML20138N677 - Advises that encl concrete & steel liner data for protective coating backfit insp program has been changed to reflect Unit 1 results for primer only,per request. Related info encl. (19 page(s), 4/17/1984)
- ML20138P394 - Rev 4 to Procedure CP-CPM-6.1, "Preparation & Approval of Const Procedures & Instructions," incorporating Document Change Notices 1 & 2. (12 page(s), 12/22/1981)
- ML20138P152 - Rev 2 to Procedure CP-QP-2.5, "Testing Personnel Training, Qualification & Certification." (2 page(s), 4/25/1983)
- ML20138M651 - Revs 0-3 to Const Procedure 35-1195-CCP-30, "Coating Containment Liners," incorporating Interim Change Notice 1. (374 page(s), 8/25/1977)
- ML20138P164 - Rev 0 to Procedure CP-QP-18.6, "Record Turnover to Texas Utils Electric Co Operation Group." (3 page(s), 1/3/1980)
- ML20138N700 - Revs 0-5 to Instruction QI-QP-11.4-26, "Insp of Steel Substrate Surface Preparation,Primer Application,Primer Repair,Seal & Finish Coat Application & Repair." (200 page(s), 5/4/1984)
- ML20138P161 - Rev 2 to Procedure CP-QP-18.4, "Permanent Plant Record Receipt Control & Storage." (6 page(s), 12/2/1980)
- ML20138P218 - Rev 1 to Procedure CP-QP-11.18, "NDE Activities." (2 page(s), 8/12/1983)
- ML20138P174 - Rev 0 to Procedure CP-QP-19.3, "Surveillance of Piping Erection." (3 page(s), 5/15/1981)
- ML20138M864 - Revs 2,5 & 8-18 to Instruction QI-QP-11.4-10, "Insp of Concrete Substrate Surface Preparation & Coatings Application & Repair." (181 page(s), 1/16/1984)
- ML20138P243 - Rev 1 to Procedure CP-QP-15.5, "Tracking of NRC Insp Findings." (5 page(s), 7/26/1983)
- ML20138P415 - Marked-up Rev 0 to Alternate Const Procedure 35-1195-CCP-30-A, "Coating Steel Substrates Inside Reactor Bldg & Radiation Areas." Related info encl. (29 page(s), 10/31/1979)
- ML20138M839 - Rev 6 to Instruction QI-QP-11.4-27, "Insp of Concrete Substrate Surface Preparation & Coatings Application & Repair." (32 page(s), 7/11/1984)
- ML20138N861 - "Compatibility of RES X W/Nutec 11S Surfacer." (17 page(s), 1/26/1978)
- ML20138P559 - Draft "BNL Comanche Peak Steam Electric Station Technical Review Team Audit Plan for Area VII Exemptions." (24 page(s), 7/31/1984)
- ML20138P274 - Rev 2 to Const Procedure CCP-30A, "Coating Steel Substrates Inside Reactor Bldg & Radiation Areas," incorporating Document Change Notices 1-6. (22 page(s), 11/16/1983)
- ML20138M881 - Revs 9-13 to Instruction QI-QP-11.4-1, "Insp of Steel Substrate Surface Preparation & Primer Application." (60 page(s), 8/19/1983)
- ML20138P574 - Rev 10 to Const Procedure CCP-30, "Coating Steel Substrates Inside Reactor Bldg & Radiation Areas," incorporating Document Change Notices 1-7. (26 page(s), 6/11/1983)
- ML20138M832 - Rev 3 to Instruction QI-QP-11.4-22, "QC Surveillance of Protective Coatings Unique Identification Number Transfer." (2 page(s), 8/7/1984)
- ML20138P353 - Rev 8 to Procedure CP-EP-5.0, "Procedure for Field Procurement." (12 page(s), 6/1/1984)
- ML20138P205 - Rev 1 to Procedure CP-QP-11.14, "Structural Steel Insp Activities." (3 page(s), 8/12/1983)
- ML20138P229 - Rev 2 to Procedure CP-QP-13.0, "Control of Measuring & Testing Equipment." (3 page(s), 11/5/1979)
- ML20138P262 - Rev 0 to Procedure CP-QP-17.4, "N-3 Data Repts." (22 page(s), 8/20/1984)
- ML20138M847 - Rev 5 to Instruction QI-QP-11.4-28, "Protective Coatings Insp Travelers." (22 page(s), 6/12/1984)
- ML20138P087 - Rev 2 to Procedure CP-QP-2.6 "Certification of CSTS Personnel." (6 page(s), 5/15/1984)
- ML20138P136 - Rev 2 to Procedure CP-QP-2.2, "Indoctrination of Record Verification Personnel." (3 page(s), 4/20/1981)
- ML20138M824 - Rev 6 to Instruction QI-QP-11.4-17, "Surveillance of Storage & Handling of Protective Coatings." (3 page(s), 6/17/1983)
- ML20138M926 - Rev 2 to Spec 2323-AS-31, "Protective Coatings." (164 page(s), 3/15/1984)
- ML20138P225 - Rev 2 to Procedure CP-QP-11.21, "Weld Insp." (3 page(s), 8/12/1983)
- ML20138N876 - "Compatibility Testing - Concresive 1411 Epoxy Mortar." (7 page(s), 1/25/1978)
- ML20138P135 - Rev 8 to Procedure CP-QP-11.2, "Surveillance & Insp of Concrete Anchor Bolt Installation." (4 page(s), 7/13/1984)
- ML20138P270 - Rev 10 to Const Procedure CCP-30, "Coating Steel Substrates Inside Reactor Bldg & Radiation Areas," incorporating Document Change Notices 1-7. (26 page(s), 6/11/1983)
- ML20138N716 - "Nutec 11S/Nutec 1201 Nutec 11S/Nutec 11/Nutec 1201 Radiation Tolerance,DBA Testing (ORNL)." (20 page(s), 6/10/1981)
- ML20138P138 - Rev 4 to Procedure CP-QP-11.3, "Electrical Insp Actitivies." (3 page(s), 8/12/1983)
- ML20138P114 - "Nutec 10/11S/11/1201 Over Magic Kote Formed Concrete." (12 page(s), 11/11/1976)
- ML20138M974 - Trip rept of 831129-30 site visit statistical analysis of backfit insp program. (4 page(s), 12/20/1983)
- ML20138P329 - Rev 0 to Instruction CP-EI-4.0-51, "Control of Protective Coatings Field Verification Activities." (5 page(s), 2/17/1984)
- ML20138P278 - Rev 5 to Const Procedure CCP-40, "Protective Coatings of Concrete Surfaces," incorporating Document Change Notices 1-6. (30 page(s), 10/14/1983)
- ML20138P191 - Rev 3 to Procedure CP-QP-20.0, "Surveillance of Preservice Insp Activities." (5 page(s), 9/15/1983)
- ML20138P171 - Rev 2 to Procedure CP-QP-19.0, "Audits." (1 page(s), 4/1/1982)
- ML20138N888 - "Compatibility of Burkes Form Release to Imperial Concrete Coating Sys." (6 page(s), 8/5/1977)
- ML20138N712 - "Recoatability of 560/1201 W/Nutec 1201 After 1 Yr Simulated Outside Exposure." (35 page(s), 7/31/1976)
- ML20138P390 - Rev 12 to Const Procedure CCP-30, "Coating Steel Substrates Inside Reactor Bldg & Radiation Areas," incorporating Document Change Notice 1. (21 page(s), 5/17/1984)
- ML20138M820 - Rev 19 to Instruction QI-QP-11.4-10, "Insp of Concrete Substrate Surface Preparation & Coatings Application & Repair." (20 page(s), 6/13/1984)
- ML20141A092 - Package of Allegation Review Repts 1-62 for plant.Supporting documentation encl. (2814 page(s), 10/16/1985)
- ML20138P155 - Rev 2 to Procedure CP-QP-18.3, "Permanent Plant Records Sys Organization." (3 page(s), 12/2/1980)
- ML20138P122 - Rev 1 to Procedure CP-QP-8.1, "Supplier Evaluation." (2 page(s), 1/28/1980)
- ML20138P147 - Rev 4 to Procedure CP-QP-2.4, "NDE Personnel Training, Qualification & Certification." (27 page(s), 2/8/1984)
- ML20138P440 - Recommends that ASLB be notified of allegations re plant protective coatings program.Allegations forwarded to util for corrective actions & preventative measures.Interim finding of BNL insp of plant under review. (12 page(s), 5/18/1984)
- ML20138P145 - Rev 3 to Procedure CP-QP-11.8, "Instrumentation & Control Insp Activities." (2 page(s), 8/12/1983)
- ML20138P345 - Rev 1 to Const Procedure CP-CPM 8.1, "Receipt,Storage & Issuance of Items," incorporating Document Change Notices 1-6. (6 page(s), 8/7/1984)
- ML20138P213 - Rev 1 to Procedure CP-QP-11.16, "Insp of Seismic Category II Supports & Structural Steel." (2 page(s), 8/12/1983)
- ML20138P132 - Rev 1 to Procedure CP-QP-11.1, "Concrete,Soils & Reinforcing Steel Testing Activities." (3 page(s), 10/18/1979)
- ML20138N821 - "Radiation Tolerance & DBA Results on Nupec Concrete Coating Sys." (32 page(s), 7/7/1981)
- ML20138N703 - Revs 0-4 to Procedure CCP-40, "Protective Coating of Concrete Surfaces." Portions of Rev 6 also encl. (138 page(s), 5/11/1982)
- ML20138M955 - Rev 4 to Procedure CP-QP-2.3, "Documentation Within QA/QC Personnel Qualification File." (8 page(s), 1/20/1983)
- ML20138P370 - Rev 8 to Procedure CP-QAP-8.1, "Receiving Insp." Supporting documentation encl. (249 page(s), 6/11/1984)
- ML20138P349 - Rev 8 to Procedure ACP-3, "Matl Receiving,Storage & Handling." (30 page(s), 4/18/1980)
- ML20138N994 - "LOCA Test of Svc Topcoated W/Phenoline 305 Finish." (9 page(s), 5/9/1978)
- ML20138M899 - Revs 0,1 & 3 to Alternate Const Procedure CCP-30A, "Coating Steel Substrates Inside Reactor Bldg & Radiation Areas." (62 page(s), 12/6/1983)
- ML20138P252 - Rev 14 to Procedure CP-QP-16.0, "Nonconformances." (18 page(s), 7/2/1984)
- ML20138P181 - Rev 4 to Procedure CP-QP-19.5, "Surveillance of Plant Conditions." (6 page(s), 2/21/1984)
- ML20138P159 - Rev 16 to Procedure CP-QP-11.12, "Insp of Installation of Radwaste Mgt Sys (RWMS)." (8 page(s), 7/23/1984)
- ML20138P094 - Rev 1 to Procedure CP-QP-5.0, "QA Review of Site Generated Procurement Documents." (2 page(s), 4/20/1981)
- ML20138P247 - Rev 1 to Procedure CP-QP-15.6, "Significant Deficiency Analysis Rept Status Tracking." (5 page(s), 7/6/1983)
- ML20138P194 - Rev 2 to Procedure CP-QP-22.0, "Surveillance of Comanche Peak Steam Electric Station Containment 1 Structural Acceptance Test." (7 page(s), 1/20/1983)
- ML20138P287 - Rev 3 to Const Procedure CCP-40, "Protective Coatings of Concrete Surfaces," incorporating Document Change Notice 1-3. (25 page(s), 11/18/1981)
- ML20138N671 - Forwards summary of statistical analysis of adhesion & dry film thickness of primer protective coating backfit insp program,based on data forwarded by L Bielfeldt 840329,0417 & 23 ltrs. (3 page(s), 5/14/1984)
- ML20138P777 - Revs 2 & 3 to Procedure CP-QP-6.0, "Preparation of Quality Instructions & Procedures." (14 page(s), 5/4/1981)
- ML20138P235 - Rev 3 to Procedure CP-QP-15.2, "Startup/Turnover QA Activities." (2 page(s), 4/16/1981)
- ML20138P090 - Rev 15 to Procedure CP-QP-3.0, "Comanche Peak Steam Electric Station Site QA/QC Organization." (12 page(s), 7/30/1984)
- ML20138M852 - Rev 0 to Instruction QI-QP-11.4-29, "Use of Elcometer Adhesion Tester for Isolating Areas of Questionable Coating Adhesion." (4 page(s), 3/12/1984)
- ML20138N686 - Forwards futher data requirements for analysis of protective coating backfit insp program,per 831129-30 discussions. Worksheets for calculating info also encl. (81 page(s), 2/16/1984)
- ML20138P452 - Draft "Allegations Concerning Comanche Peak Protective Coatings." Related documentation encl. (23 page(s), 8/3/1984)
- ML20138P141 - Rev 0 to Procedure CP-QP-2.2A, "Training & Certification of Unit 2 Records Verification Personnel." (1 page(s), 8/10/1984)
- ML20138M970 - Const Procedure CCP-30,Attachment 2, "Rev 1 to Special Coating Procedure M-7, 'Application of Keeler & Long Epoxy Primer 6548 & Epoxy Enamel Topcoat 7475...,'" incorporating Document Change Notice 1. (11 page(s), 4/24/1984)
- ML20138P298 - Rev 21 to Instruction QI-QP-11.4-5, "Insp of Steel Substrate Primer Repair & Seal & Finish Coat Application & Repair." (24 page(s), 8/25/1983)
- ML20138P231 - Rev 4 to Procedure CP-QP-15.0, "Tagging Sys." (8 page(s), 1/11/1984)
- ML20138N674 - Forwards marked-up further data requirements for analysis of protective coatings backfit insp program,per request. (4 page(s), 3/29/1984)
- ML20138P129 - Rev 1 to Procedure CP-QP-2.0, "Implementation of Comanche Peak Steam Electric Station QA Program." (4 page(s), 10/9/1979)
- ML20138P255 - Rev 5 to Procedure CP-QP-16.1, "Significant Const Deficiencies." (6 page(s), 7/23/1982)
- ML20138M950 - Rev 11 to Const Procedure CCP-30,Attachment 2, "Rev 2 to Special Coating Procedure M-9, 'Application of Carboline 191 Primer as Brush Spray or Spray Primer,'" incorporating Document Change Notice 1. (7 page(s), 11/9/1983)
- ML20138P495 - Draft "BNL Comanche Peak Steam Electric Station Technical Review Team Audit Plan for Area I Backfit Program." (8 page(s), 7/31/1984)
- ML20138P221 - Rev 2 to Procedure CP-QP-11.20, "Insp of Fire Protection." (2 page(s), 1/23/1984)
- ML20138N872 - "Nutec 11/Reactic 1201 DBA per Bechtel CP 956." (7 page(s), 12/31/1977)
- ML20138P168 - Rev 1 to Procedure CP-QP-18.8, "Record Verification." (6 page(s), 1/10/1984)
- ML20138M943 - Rev 1 to Spec 2323-AS-31, "Protective Coatings." (276 page(s), 3/13/1978)
- ML20138P334 - Forwards response to addl questions re Protective Coating Allegations 15,31 & 33,per NRC 840727 memo.Response to all addl questions complete. (10 page(s), 8/21/1984)
- ML20138P337 - Revs 0-14 to Procedure CP-QP-3.0, "Comanche Peak Steam Electric Station Site QA/QC Organization." (86 page(s), 4/17/1984)
- ML20138P249 - Rev 2 to Procedure CP-QP-15.7, "Tracking of Audit Repts/ Corrective Action Repts." (4 page(s), 7/26/1983)
- ML20138P112 - Revs 2,6 & 9 to Procedure CP-QP-7.1, "Issuance & Control of Quality Procedures & Instructions." (27 page(s), 8/24/1984)
- ML20138P183 - Rev 7 to Procedure CP-QP-19.6, "Surveillance of Const & Startup/Turnover Activities." (3 page(s), 9/9/1984)
- ML20138P153 - Rev 2 to Procedure CP-QP-11.11, "Reinsp of Comanche Peak Diesel Generator Auxiliary Skid & Support Brackets." (5 page(s), 7/28/1981)
- ML20138P188 - Rev 1 to Procedure CP-QP-19.7, "Monitoring Welding Activities." (4 page(s), 5/15/1984)
- ML20138N868 - "Effects of 'Mudcracking' on DBA Performance of Nutec 11S." (6 page(s), 4/30/1978)
- ML20138P215 - Rev 2 to Procedure CP-QP-11.17, "Electrical Startup Insp Activities." (3 page(s), 9/6/1983)
- ML20138P259 - Rev 4 to Procedure CP-QP-17.0, "Corrective Action." (2 page(s), 4/27/1984)
- ML20138P285 - Forwards summary of statistical analysis of primer protective coating backfit insp program at facility,based on util 840329,0417 & 23 ltrs.Adhesion & dry film thickness two variables analyzed. (3 page(s), 5/15/1984)
- ML20138P116 - Rev 4 to Procedure CP-QP-8.0, "Receiving Insps." (1 page(s), 8/9/1984)
- ML20138P455 - "Elcometer Adhesion Tests Nutec Concrete Coating Repair Sys 11S/1201/11S/1201 11S/1201/11/1201." Related documentation encl. (13 page(s), 4/19/1984)
- ML20138P356 - Rev 18 to Const Procedure DCP-3, "Comanche Peak Steam Electric Station Document Control Program," incorporating Document Change Notice 1. (17 page(s), 11/5/1984)
- ML20138P305 - Forwards NRC 840523 ltr to util re special insp of coatings program at plant for concurrence,per 840417 discussion. Concurrence will be assumed if response not received within 2 days. (1 page(s), 5/22/1984)
- ML20138P165 - Rev 0 to Procedure CP-QP-18.07, "N-5 & N-3 Code Data Repts." (2 page(s), 2/27/1981)
- ML20138M915 - Revs 0-5 to Instruction QI-QP-11.4-27, "Insp of Concrete Substrate Surface Preparation & Coatings Application & Repair." (172 page(s), 7/11/1984)