NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Design Verification Audit of SPDS for Byron Generating Station Units 1 & 2," conducted on 850724-26. Several human engineering discrepancies identified.

Accession Number: ML20138M466

Date Released: Sunday, May 31, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer