Home > NRC Library > ADAMS Public Documents
Forwards documentation for review by NRC staff to support restart issues as identified on Unit 2 startup commitment as submitted.
Accession Number: ML20138K159
Date Released: Sunday, May 31, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20138K155 - Forwards documentation for review by NRC staff to support restart issues as identified on Unit 2 startup commitment as submitted. (40 page(s), 2/10/1997)
- ML20138K496 - Rev 8 to ORT 73, "Electrical Penetration Leak Test for Unit 1." (7 page(s), 1/25/1997)
- ML20138K447 - Rev 2 to OI 115, "SFP Svc Water Cooling Isolation for Maint." (18 page(s), 1/25/1997)
- ML20138K430 - Rev 2 to OI 73J, "Water Treatment Resin Sampling." (3 page(s), 1/25/1997)
- ML20138K643 - Rev 5 to PC 77,Part 4, "Annual Automatic Dry-Pipe Fire Protection Sys Valve Trip-Test & Alarm Verification Test." (4 page(s), 1/30/1997)
- ML20138K510 - Rev 18 to ORT 59, "Train Spray Sys CIV Leakage Test for Unit 2." (10 page(s), 1/31/1997)
- ML20138K203 - Rev 6 to IT 380, "Purge Valve Air Sys Check Valve (Quarterly) for Unit 1." (14 page(s), 1/31/1997)
- ML20138K475 - Rev 19 to ORT 60, "Train B Spray Sys CIV Leakage Test for Unit 1." (9 page(s), 1/31/1997)
- ML20138K808 - "Change Wiring of Flow Controllers 2YIC-926A for Spray Additive Tank Sys on C01 In CR for Unit 2." (9 page(s), 12/15/1996)
- ML20138K173 - Rev 13 to IT 200, "Pressurizer Power-Operated Relief Valves & Block Valves (Cold Shutdown) for Unit 1." (18 page(s), 1/31/1997)
- ML20138K362 - Rev 10 to OI 22A, "Changing Reactor Coolant Micron Filter (F1)." (5 page(s), 1/30/1997)
- ML20138K754 - "Addition of CIV & Test Connection on Nitrogen Supply to Accumulator & Raising of Nitrogen Piping Interfering w/CCW Supply Piping." (13 page(s), 10/10/1995)
- ML20138K575 - Rev 21 to PC 9,Part 1, "Monthly Shifting of Instrument Air Compressors & Air Dryer Checks." (13 page(s), 1/25/1997)
- ML20138K393 - Rev 7 to OI 22E, "Changing Letdown Gas Stripper Filters (F60A&B)." (4 page(s), 1/30/1997)
- ML20138K789 - Rev 0 to IWP 96-026-01, "U2R22 Installation & Mod of IEB 79-14 Pipe Supports." (37 page(s), 10/29/1996)
- ML20138K307 - Rev 38 to OP 9C, "Containment Venting & Purging." (13 page(s), 1/31/1997)
- ML20138K735 - "RHR Controller Repositioning for Unit 2." (8 page(s), 9/25/1996)
- ML20138K264 - Rev 12 to IT 535, "Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 2." (29 page(s), 1/31/1997)
- ML20138K312 - Rev 43 to RP 1A, "Preparation for Refueling." (17 page(s), 1/31/1997)
- ML20138K712 - Rev 4 to RF 235.1, "EH Filter Changeout & Magnetic Plug Insp Unit 2." (8 page(s), 1/25/1997)
- ML20138K318 - Rev 33 to RP 1B, "Recovery From Refueling." (14 page(s), 1/31/1997)
- ML20138K400 - Rev 3 to OI 22F, "Changing Boric Acid Filters (F3)." (4 page(s), 1/30/1997)
- ML20138K470 - Rev 17 to ORT 59, "Train Spray Sys CIV Leakage Test for Unit 1." (9 page(s), 1/31/1997)
- ML20138K241 - Rev 12 to IT 530, "Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 1." (29 page(s), 1/31/1997)
- ML20138K590 - Rev 2 to PC 23,Part 5, "Charging Pump Preventative Maint." (10 page(s), 1/25/1997)
- ML20138K336 - Rev 10 to OI 17, "Letdown Gas Stripper Operation." (17 page(s), 1/25/1997)
- ML20138K717 - Rev 6 to TS 37, "Containment Spray Nozzles Check (Frequency of Less Than or Equal to Five Yrs) for Unit 1." (4 page(s), 1/31/1997)
- ML20138K381 - Rev 6 to IO 22C, "Changing Spent Fuel Pool Filter (F6)." (4 page(s), 1/30/1997)
- ML20138K702 - Rev 5 to RF 230.1, "EH Filter Changeout & Magnetic Plug Insp Unit 1." (6 page(s), 1/25/1997)
- ML20138K418 - Rev 4 to OI 48B, "Lube Oil Filter Changouts." (5 page(s), 1/25/1997)
- ML20138K499 - Rev 9 to ORT 4, "Main Turbine Mechanical Overspeed Trip Device for Unit 2." (21 page(s), 1/31/1997)
- ML20138K539 - Rev 28 to PC 1,Part 2, "Monthly Heating & Ventilation Sys Checks,Unit 1 Turbine Hall." (6 page(s), 1/25/1997)
- ML20138K323 - Rev 9 to RP 6A, "SG Crevice Flush (Vacuum Mode)." (52 page(s), 1/31/1997)
- ML20138K516 - Rev 18 to ORT 60, "Train B Spray Sys CIV Leakage Test for Unit 2." (9 page(s), 1/31/1997)
- ML20138K504 - Rev 7 to ORT 50, "PRT to Gas Analyzer Sample Line for Unit 2." (8 page(s), 1/31/1997)
- ML20138K669 - Rev 4 to RF 190, "Condenser Hotwell Insp for Unit 1." (3 page(s), 1/25/1997)
- ML20138K225 - Rev 7 to IT 385, "Purge Valve Air Sys Check Valve (Quarterly) for Unit 2." (14 page(s), 1/31/1997)
- ML20138K455 - Rev 9 to ORT 4, "Main Turbine Mechanical Overspeed Trip Device Unit 1." (21 page(s), 1/31/1997)
- ML20138K544 - Rev 21 PC 1,Part 3, "Monthly Heating & Ventilation Sys Checks,Unit 2 Turbine Hall." (3 page(s), 1/25/1997)
- ML20138K299 - Rev 46 to OP 4D,Part 1, "Draining RCS to CVCS Hut W/o Entering Reduced Inventory." (33 page(s), 1/31/1997)
- ML20138K773 - "Work Plan Description." (4 page(s), 11/13/1996)
- ML20138K410 - Rev 5 to OI 22H, "Changing Boric Acid Concentrates Filters (F-5A&B)." (2 page(s), 1/25/1997)
- ML20138K598 - Rev 43 to PC 24, "Containment Insp Checklist (Monthly) Unit 1." (17 page(s), 1/25/1997)
- ML20138K376 - Rev 7 to OI 22B, "Changing Seal Water Return Filter (F2)." (4 page(s), 1/30/1997)
- ML20138K461 - Rev 11 to ORT 31, "Nitrogen Supply to Pressurizer Relief Tank for Unit 1." (8 page(s), 1/31/1997)
- ML20138K819 - "Work Plan Description,Removal & Installation of Conduit Near Unit 2 26' Elevation Containment Hatch Third Door (Door 235)." (5 page(s), 12/17/1996)
- ML20138K813 - "Change Wiring of Flow Controllers 2YIC-926B for Spray Additive Tank Sys on C01 in CR for Unit 2." (12 page(s), 12/15/1996)
- ML20138K387 - Rev 9 to OI 22D, "Changing Seal Water Injection Filters (F39A&B)." (6 page(s), 1/30/1997)
- ML20138K486 - Rev 7 to ORT 71, "Electrical Penetration Leak Test for Unit 1." (3 page(s), 1/31/1997)
- ML20138K405 - Rev 5 to OI 22G, "Changing Boric Acid Evaporation Feed Filters (F8)." (2 page(s), 1/30/1997)
- ML20138K738 - "U2R22 Installation & Mod of Pipe Supports." (35 page(s), 12/19/1996)
- ML20138K303 - Rev 1 to OP 4D,Part 5, "Draining RCS to CVCS Hut W/o Entering Reduced Inventory & W/o SG Tubes." (31 page(s), 1/31/1997)
- ML20138K606 - Rev 43 to PC 24, "Containment Insp Checklist (Monthly) Unit 2." (18 page(s), 1/25/1997)
- ML20138K424 - Rev 6 to OI 64A, "Installation & Removal of Purge Valve Component Bypass Lines." (7 page(s), 1/25/1997)
- ML20138K768 - Rev 0 to IWP 96-022-2, "Installation of New DC Control Power to 2B03 Per MR 96-022 for Unit 2." (32 page(s), 10/30/1996)
- ML20138K255 - Rev 2 to IT 530B, "Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) for Unit 1." (28 page(s), 1/31/1997)
- ML20138K729 - Rev 6 to TS 38, "Containment Spray Nozzles Check (Frequency of Less Than or Equal to Five Yrs) for Unit 2." (4 page(s), 1/31/1997)
- ML20138K626 - Rev 9 to PC 77,Part 1, "Refueling Interval Automatic Fire Protection Sys Valve Trip-Test & Alarm Verification Test Unit 1." (7 page(s), 1/25/1997)
- ML20138K421 - Rev 15 to OI 48E, "EH Fluid Sys." (8 page(s), 1/30/1997)
- ML20138K519 - Rev 13 to ORT 67, "Component Cooling Water to & From Excess Letdown Heat Exchanger Unit 2 - Refueling Shutdown." (14 page(s), 1/31/1997)
- ML20138K681 - Rev 3 to RF 195, "Condenser Hotwell Insp for Unit 2." (3 page(s), 1/25/1997)
- ML20138K731 - Rev 9 to TS 80, "Sampling of Emergency Fuel Oil Tank (T-72), Fuel Oil Storage Tanks (T-175A,B) & EDG Day Tanks (T-31A,B & T-176A,B)(Quarterly)." (52 page(s), 1/31/1997)
- ML20138K171 - Rev 1 to "Work Plan for As-Built Wire Tracing of Unit 2 CCW & CVCS Instrumentation." (40 page(s), 10/12/1996)
- ML20138K465 - Rev 9 to ORT 50, "PRT to Gas Analyzer Sample Line Unit 1." (7 page(s), 1/31/1997)
- ML20138K491 - Rev 8 to ORT 72, "Electrical Penetration Leak Test for Unit 1." (3 page(s), 1/25/1997)
- ML20138K414 - Rev 17 to OI 32, "Hydrogen Sys Operation." (25 page(s), 1/25/1997)
- ML20138K617 - Rev 13 to PC 43,Part 3, "Svc Water Strainers." (9 page(s), 1/30/1997)
- ML20138K442 - Rev 2 to OI 86A, "Instrument Air Dryer Z-31 Operating Instructions." (5 page(s), 1/25/1997)
- ML20138K803 - "Work Plan Description." (10 page(s), 11/9/1996)
- ML20138K654 - Rev 6 to PC 77,Part 6, "Annual Gas Turbine & Auxillary Transformer Fire Protection Sys Valve Trip-Test & Alarm Verification Test." (11 page(s), 1/25/1997)
- ML20138K294 - Rev 3 to IT 535B, "Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) Unit 2." (33 page(s), 1/31/1997)
- ML20138K358 - Rev 2 to OI 17B, "Letdown Gas Stripper Preparation for Maint & Recovery Unit 2." (18 page(s), 1/25/1997)
- ML20138K351 - Rev 2 to OI 17A, "Letdown Gas Stripper Preparation for Maint & Recovery for Unit 1." (18 page(s), 1/25/1997)
- ML20138K290 - Rev 2 to IT 535A, "Leakage Reduction & Preventive Maint Program Test of Train A HHSI & RHR Sys (Refueling) Unit 2." (35 page(s), 1/31/1997)
- ML20138K528 - Rev 9 to ORT 72, "Electrical Penetration Leak Test for Unit 2." (3 page(s), 1/25/1997)
- ML20138K637 - Rev 11 to PC 77,Part 2, "Refueling Interval Automatic Fire Protection Sys Valve Trip-Test & Alarm Verification Test Unit 2." (8 page(s), 1/25/1997)
- ML20138K251 - Rev 2 to IT 530A, "Leakage Reduction & Preventive Maint Program Test of Train A HHSI & RHR Sys (Refueling) for Unit 1." (34 page(s), 1/31/1997)
- ML20138K435 - Rev 6 to OI 86, "Instrument Air K2A/K2B & Svc Air K3A/K3B Compressor Run-In Operating Intructions." (11 page(s), 1/25/1997)
- ML20138K479 - Rev 15 to ORT 67, "Component Cooling Water to & From Excess Letdown Heat Exchanger-Refueling Shutdown for Unit 1." (15 page(s), 1/31/1997)
- ML20138K523 - Rev 7 to ORT 71, "Electrical Penetration Leak Test for Unit 2." (3 page(s), 1/31/1997)
- ML20138K186 - Rev 15 to IT 205, "Pressurizer Power-Operated Relief Valves & Block Valves (Cold Shutdown) for Unit 2." (19 page(s), 1/31/1997)
- ML20138K533 - Rev 7 to ORT 73, "Electrical Penetration Leak Test for Unit 2." (11 page(s), 1/25/1997)