Home > NRC Library > ADAMS Public Documents
Final response to FOIA request for three categories of records re facility.Forwards documents listed on Apps A through W.Portions partially withheld (ref FOIA Exemptions 5,6 & 7).
Accession Number: ML20138G131
Date Released: Sunday, May 31, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20138G124 - Final response to FOIA request for three categories of records re facility.Forwards documents listed on Apps A through W.Portions partially withheld (ref FOIA Exemptions 5,6 & 7). (26 page(s), 11/7/1985)
- ML20138G706 - Notifies of opening of Ofc of Investigations investigations. Investigation Status Records Case 4-83-005 & Case 4-83-006 forwarded.W/o encl.Related info encl. (14 page(s), 3/22/1983)
- ML20138G155 - Nonconformance rept re insp of safety-related areas, allegations,galvanizing touch up paint & carbo zinc.Related info encl. (14 page(s), 1/26/1983)
- ML20138G556 - Investigation Rept Q4-83-007 on 830317.Major areas investigated:allegations re generic procedural violation on intermittent fillet welds.Forwards Nonconformance Rept 1SN9130E. (3 page(s), 3/29/1983)
- ML20138H395 - Inquiry Rept Q4-83-024.Major areas investigated:alleged intimidation of util electrical QC inspectors.Dept of Labor 830926 rept concludes discrimination factor in complaintee case.Related info encl. (3 page(s), 10/13/1983)
- ML20138G644 - Inquiry Rept Q4-82-030 on 821220.Major areas investigated: alleged discrimination by Daniel Intl Corp against Level 2 mechanical welding QC inspector.Related info encl. (28 page(s), 1/4/1983)
- ML20138G780 - Nonconformance rept re Nuclear Energy Svcs inability to perform "meaningful ultrasonic testing exam" due to high rounded weld crowns.Caused by diverse interpretations of Bechtel Spec M-204.Related info encl. (8 page(s), 12/3/1983)
- ML20138G760 - Concurs w/recommendation not to formally interview unnamed terminated employee who threatened QC inspectors.Related info encl. (14 page(s), 7/13/1983)
- ML20138G721 - Forwards notices of initiation of investigation per director of Ofc of Investigations.W/o encl. (1 page(s), 3/23/1983)
- ML20138G745 - Inquiry Rept Q4-83-014.Major areas investigated:allegation re improper interpretation of NRC regulations by Daniel Intl QC supervisors.Related info encl. (1 page(s), 6/29/1983)
- ML20138G887 - Informs of allegation re fabrication of cable tray supports from unauthorized steel.Info deleted. (1 page(s), 3/17/1982)
- ML20138G578 - Inquiry Rept Q4-82-0012/4-82-0008.Major areas investigated: allegations re discriminatory personnel practices. Confidentiality agreement & related info encl. (41 page(s), 8/4/1982)
- ML20138G658 - Insp Rept A4-83-002.Major areas investigated:qualification of Daniel QC inspectors to sign off on hanger location. Related info encl. (65 page(s), 2/7/1983)
- ML20138G638 - Investigation Rept 4-82-018 on 821130-830114.Major areas investigated:allegations re counterfeit safety-related pipe hanger.Related info encl. (81 page(s), 3/29/1983)
- ML20138K397 - Nonconformance rept re quality engineering (QE),senior QE ofc,administration bldg & corrective action repts.Related info encl. (36 page(s), 8/25/1983)
- ML20138G230 - Investigation Rept A4-83-004 on 821201.Major areas investigated:allegations re improper use of white-out. Related info encl. (3 page(s), 2/11/1983)
- ML20138G318 - Rev 7 to Vol III,Section VII,of Procedure WP-VII-209, "Preparation & Processing of Travelers." (57 page(s), 11/26/1980)
- ML20138H422 - Nonconformance repts re failure to comply w/listed procedures re issuing of rods before time indicated on W100.Related info encl. (68 page(s), 7/29/1982)
- ML20138G616 - Inquiry Rept Q4-82-015.Major areas investigated:allegations re const deficiencies.Summary of conversation re Individual A encl.Related info also encl. (2 page(s), 8/5/1982)
- ML20138H415 - Forwards correspondence received from Dept of Labor for appropriate action.Related info encl. (36 page(s), 9/30/1983)
- ML20138G593 - Nonconformance rept re intermittent fillet welds on various raceway supports through power block.Block not installed per AWS D1.1-75.Related info encl. (10 page(s), 2/18/1983)
- ML20138G805 - Nonconformance rept re violation of procedure requiring names of all welders on W100.Related info encl. (14 page(s), 6/10/1983)
- ML20138G260 - Rev 8 to Vol 1,Section IX,of Procedure AP-IX-04, "Records & Filing." Related info encl. (36 page(s), 6/15/1982)
- ML20138G738 - Inquiry Rept Q4-83-013.Major areas investigated:allegation of improper disposition of nonconformance repts by Daniel Intl QC.Info deleted.Related info encl. (3 page(s), 6/29/1983)
- ML20138G182 - Draft memo closing issue re qualification of Daniel Intl QC inspectors to sign off on hanger locations.In-ofc review of listed documents improperly voided before arriving at final determination.Related info encl. (10 page(s), 3/30/1984)
- ML20138G893 - Identifies Individuals A,B,C & D per 820317 memo.Info deleted.Related info encl. (4 page(s), 3/17/1982)
- ML20138G726 - Inquiry Rept Q4-83-008.Major areas investigated:allegation re alteration of electrical QC nonconformance repts by Daniel Intl QC mgt.Related info encl. (4 page(s), 4/1/1983)
- ML20138G698 - Investigative memo re 830203-04 interview concerning confidentiality as discussed w/anonymous person.Info deleted.Related info encl. (31 page(s), 2/11/1983)
- ML20138G606 - Forwards Ofc of Investigation rept re alleged discriminatory personnel practices.Weight of evidence contrary to allegations.Investigation closed.W/o encl. (2 page(s), 3/15/1983)
- ML20138G210 - Discusses insp on 821018-22.No violation or deviation identified & no apparent improper licensee actions re three-part memorandum used for tracking documents.Related info encl. (9 page(s), 3/30/1984)
- ML20138G631 - Forwards final rept of investigation on counterfeit safety- related pipe hanger.Portion of pipe hanger fabricated from scrap matl after original bottom piece removed due to improper welding.Related info encl. (42 page(s), 5/23/1983)
- ML20138G767 - Inquiry Rept Q4-84-002.Major areas investigated:allegations re improper disposition of bad weld,improper QC control practices & intimidation of QC inspector.Related info encl. (34 page(s), 1/26/1984)
- ML20138G570 - Nonconformance rept re improper intermittent fillet welds on various raceway supports throughout power block.Block not installed,per AWS D1.1-75.Related info encl. (16 page(s), 3/2/1983)
- ML20138G280 - Rev 4 to Vol III,Section VII,of Procedure WP-VII-208, "Installation of Component Supports." Related info encl. (13 page(s), 5/13/1980)
- ML20138G309 - Rev 4 to Vol III,Section VII,of Procedure WP-VII-207, "Fabrication of Component Supports." (13 page(s), 5/13/1980)
- ML20138H368 - Forwards two reg guides addressing qualification,selection & training of insp personnel & 10CFR0-199,per undated request to IE. (5 page(s), 7/28/1982)
- ML20138G611 - Discusses two allegations by D Lingenfelter stemming from investigation re falsification of fake hanger.Work records altered & employees instructed not to talk w/NRC.Related info encl. (4 page(s), 7/28/1982)
- ML20138G817 - Inquiry Rept Q4-83-005.Major areas investigated:alleged improper electrical fabrication due to shortage of specified steel.Info deleted.Related info encl. (11 page(s), 3/7/1983)
- ML20138G790 - Nonconformance rept re Weld FW512 w/internal root condition. Recommended disposition to "use as is" approved.Related info encl. (3 page(s), 12/20/1983)
- ML20138G691 - Insp Rept A4-83-003.Major areas investigated:allegations concerning procedural violation re certificate tests.Info deleted. (2 page(s), 2/9/1983)
- ML20138H384 - Informs that recipient ltr reviewed.Info re concerns at facility requested.Info deleted.Related info encl. (2 page(s), 8/11/1982)