Home > NRC Library > ADAMS Public Documents
Forwards detailed comments on draft SER re revised inservice pump & valve test program for second 10-yr insp interval & Rev 2 to "Inservice Pump & Valve Test Program."
Accession Number: ML20137Y385
Date Released: Monday, October 28, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20137Y379 - Forwards detailed comments on draft SER re revised inservice pump & valve test program for second 10-yr insp interval & Rev 2 to "Inservice Pump & Valve Test Program." (31 page(s), 9/26/1985)
- ML20137Y387 - Rev 2 to "Inservice Pump & Valve Test Program." W/six oversize drawings. (73 page(s), 9/26/1985)
- ML20262F811 - "Flow Diagram:Drywell N2 Atmospheric Compressor System," as-built.Sheet 2. (1 page(s), 8/7/1984)
- ML20262F993 - "Flow Diagram:Post Accident Sampling System," as-built. (1 page(s), 8/20/1984)
- ML20262F997 - "Flow Diagram:Control Rod Drive Hydraulic System Headers & Scram Discharges Volumes," as-built. (1 page(s), 4/12/1984)
- ML20262G002 - "Flow Diagram:Drywell N2 Instrument Header," as-built. Sheet 3. (1 page(s), 9/17/1984)