NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards LER 97-002 documenting failure of HPCI pump discharge valve to open upon manual demand signal,during SD conditions.Util commitment is to evaluate SR & balance of plant valves from overall plant risk perspective.

Accession Number: ML20137C064

Date Released: Saturday, May 30, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer