NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Safety Evaluation of Shroud Head Bolt Assembly Failures at Peach Bottom Atomic Station Unit 3," prepared by GE.Metallurgical exam of failed bolt revealed IGSCC cause of failure.

Accession Number: ML20136J479

Date Released: Friday, May 29, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer