Home > NRC Library > ADAMS Public Documents
Further response to FOIA request for documents re EG&G rept on harassment & intimidation.Forwards App B documents. Documents also available in PDR.Portions of App C Documents 1-4 withheld (ref FOIA Exemptions 4 & 6).
Accession Number: ML20136F578
Date Released: Sunday, May 31, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20138B980 - Further response to FOIA request for documents re EG&G rept on harassment & intimidation.Forwards App B documents. Documents also available in PDR.Portions of App C Documents 1-4 withheld (ref FOIA Exemptions 4 & 6). (4 page(s), 10/16/1985)
- ML20138C170 - Approves DG Bowers & H Margulies as subcontractors to assist INEL in "Evaluation of Selected NRC Open Items Before Plant Fuel Load," FIN A-6819,Project 2,per INEL 840727 request.Related documentation encl. (49 page(s), 7/31/1984)
- ML20138B997 - Forwards statements of work for FINs A-6819 (Project 2), A-6821 (Project 2) & A-0802 re evaluation of selected open NRC items at plant for review & comment. (1 page(s), 6/15/1984)
- ML20138C129 - Forwards INEL planned staffing for Cycle 4 Comanche Peak Technical Review Team.Planned staffing for Cycle 5 will be identified as soon as possible. (2 page(s), 9/6/1984)
- ML20138C194 - Rev 1 to project & budget proposal for NRC work: "Evaluation of Selected NRC Open Items Before Plant Fuel Load." (9 page(s), 8/15/1985)
- ML20138C117 - Forwards,for concurrence,std order for DOE work,changing statement of work for "Evaluation of Selected NRC Open Items Before Plant Fuel Load," (FIN A-6819,Project 2). (4 page(s), 8/24/1984)
- ML20138C079 - Draft "Investigation & Assessment of Work Climate at Comanche Peak Electric Station." (45 page(s), 8/31/1984)
- ML20138C147 - Forwards,for concurrence,std order for DOE work, "Evaluation of Selected NRC Open Items Before Plant Fuel Load," FIN A-6819.INEL proposal dtd Sept 1984 acceptable.LP Leach 850905 & 20 ltrs to DOE encl. (9 page(s), 9/13/1984)
- ML20138C059 - Forwards project descriptive summary for FIN A-6819, "Evaluation of Selected NRC Open Items Before Fuel Load (Program 1)," statement of work & NRC Form 173,for review & approval. (12 page(s), 7/13/1984)
- ML20138C005 - Forwards std order for DOE work,supporting "Evaluation of Selected NRC Open Items Before Plant Fuel Load," FIN A-6819,Project 2.Proposal requested within 14 days. (15 page(s), 7/2/1984)
- ML20138C182 - Forwards project & budget proposals for NRC work for Rev 1 to, "Evaluation of Selected NRC Open Items Before Plant Fuel Load" & "Evaluation of Selected Open NRC Activities at Near-Term OL Sites Needing Action...." (1 page(s), 8/23/1984)
- ML20136F573 - Provides clarification on NRC position re intimidation at facility.Overall task EG&G contracted to perform defined. EG&G rept will be used as input to NRC assessment. (1 page(s), 12/4/1984)
- ML20138C019 - Approves CM Rice & W Stratton as subcontractors to assist INEL in "Evaluation of Selected NRC Open Items Before Plant Fuel Load," FIN A-6819,Project 2,per LP Leach 840717 request. (2 page(s), 7/18/1984)