Home > NRC Library > ADAMS Public Documents
Further response to FOIA request for records re voluntary or required redress of sites where const was terminated, including CRBR & legal analysis.Forwards App E documents.App D & E documents available in PDR.Photographs also available.
Accession Number: ML20136E200
Date Released: Sunday, May 31, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20138Q830 - Further response to FOIA request for records re voluntary or required redress of sites where const was terminated, including CRBR & legal analysis.Forwards App E documents.App D & E documents available in PDR.Photographs also available. (6 page(s), 12/3/1985)
- ML20136F902 - Forwards request for addl info for environ review of project termination,including site plan showing areas disturbed by const-related activities & plan for all structures. (2 page(s), 4/1/1985)
- ML20138Q890 - Forwards order revoking CPPR-88,per util request.Facility has been disabled for nuclear fuel use by removing control rod drives from reactor & fuel assemblies from site & severing steam & feedwater lines.Related info encl. (7 page(s), 5/7/1985)
- ML20138Q876 - Discusses withdrawal of application for OL.Board issued 840829 memorandum & order authorizing withdrawal of application after NRC verifies implementation of site restoration plan on 850228. (1 page(s), 9/11/1984)
- ML20136E892 - Comments on termination of facility.NRC should request applicant to submit formal site disposition plan & schedule to confirm site restoration steps to be taken.List of info necessary for environ review encl. (3 page(s), 4/9/1984)
- ML20136E971 - Forwards request for addl info re site stabilization plan. Recommends site insp of transmission lines & railroad spur to check soil stabilization.Cancellation schedule encl. (4 page(s), 5/24/1984)
- ML20136G060 - Forwards environ review of applicant request to cancel application for license.Cancellation does not pose any immediate detrimental environ impacts provided applicant stabilizes berm built around excavation. (3 page(s), 5/31/1985)
- ML20136F659 - Informs of review of environ info in CJ Paperiello ltr to JR Schott & encl insp rept.Rept indicates that erosion stabilized according to 840601 plan except in settling basin.No further action necessary. (1 page(s), 1/25/1985)
- ML20136F009 - Provides environ review of applicant request to withdraw OL application.No significant detrimental environ impact on or offsite provided applicant continues to implement restoration plan as submitted. (2 page(s), 6/20/1984)
- ML20136E341 - Submits review of memo re procedures for cancelling CPs. Applicant should write procedure to allow timely NRC final insp & disposition. (2 page(s), 12/8/1982)
- ML20136E597 - Advises of 831110 site visit to observe implementation of 820830 soil stabilization & erosion control plan. (1 page(s), 10/28/1983)
- ML20136E196 - Comments on 811119 proposed plan for redress & restoration work at site submitted by util.Review of Natl Park Svc comments on restoration work reveals no mention of methods to control erosion in const areas having little vegetation. (2 page(s), 2/3/1982)
- ML20138Q881 - Submits licensee site restoration program & NRC plan for cancellation of CP,per encl Board 840829 memorandum & order authorizing withdrawal of application for OL subj to implementation of restoration plan. (2 page(s), 10/3/1984)
- ML20138Q885 - Submits list of remaining licenses for Zimmer Station,per request. (1 page(s), 10/8/1984)
- ML20138Q904 - Submits Board questions re identification of alternate user for site.Board will reschedule conference call or establish new procedure for response to questions. (1 page(s), 2/21/1985)
- ML20138Q899 - Requests that NRC contact be identified & that ODE be advised who will be responsible for followup work re Commission 820817 memorandum & order concerning site redress.W/three oversize encls. (1 page(s), 3/23/1984)
- ML20136F072 - Forwards environ review of util request to withdraw OL application.No significant detrimental environ impact will be felt due to termination of OL proceeding w/completion of applicant 840601 restoration plan. (3 page(s), 7/5/1984)
- ML20136E604 - Forwards RL Ballard 821208 memo re branch recommendations for NRC action in conjunction w/voluntary termination of CP,in response to 831101 telcon.Recommendations consistent w/ASLB directives. (1 page(s), 11/3/1983)
- ML20136F459 - Submits daily highlight.On 841031,application for OL withdrawn in response to applicant request.Steps will be taken to terminate CP after verification that site restored to environmentally acceptable condition. (1 page(s), 11/2/1984)
- ML20136E747 - Forwards results of erosion control plan execution insp. Applicant performed excellent job of establishing erosion controls. (4 page(s), 2/1/1984)