Home > NRC Library > ADAMS Public Documents
Further response to request for all info re Ford Amend Study.Encl Apps O & P documents also available in PDR.App Q document withheld (ref FOIA Exemption 5).
Accession Number: ML20136B092
Date Released: Friday, May 29, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20136B086 - Further response to request for all info re Ford Amend Study.Encl Apps O & P documents also available in PDR.App Q document withheld (ref FOIA Exemption 5). (14 page(s), 11/25/1985)
- ML20136B369 - Provides rationale for consideration of independent sampling of QA programs. (2 page(s), 8/31/1982)
- ML20136B349 - Statement by GA Maneatis before Subcommittee on Interior & Insular Affairs on 811119 re util QA program. (23 page(s), 11/19/1981)
- ML20136B108 - Forwards Region IV summary of 740605-07 predocketing insp of plant.Several deficiencies observed.Application should be docketed. (1 page(s), 6/19/1974)
- ML20136B272 - Discusses IE programmatic insps for design during const, including quantitative data on insps performed. (5 page(s), 10/28/1981)
- ML20136B278 - "Design Verification Program Seismic Svc-Related Contracts Prior to June 1978." (27 page(s), 12/3/1981)
- ML20136B120 - Forwards summary of 740605-07 predocketing insp of applicant QA program,conducted in accordance w/encl marked-up Instruction TI-4000/1.No substantive deficiencies identified to preclude docketing. (37 page(s), 6/14/1974)
- ML20136B436 - PG&E organization chart. (4 page(s), 11/1/1982)
- ML20136E544 - Discusses logistics for proceeding,touching on areas of lodging,transportation & hearing testimony. (2 page(s), 10/24/1983)
- ML20136B395 - Provides rev & description of scope & responsibilities of Region V insp activities re plant design verification program. (2 page(s), 9/9/1982)
- ML20136B209 - Forwards Predocketing Insp Rept P-506/74-01 of insp on 740605-07.Inconsistencies w/AEC requirements noted. (2 page(s), 6/24/1974)
- ML20136B309 - Forwards summary of findings based on review of Quadrex rept re South Texas Project & relationship to Diablo Canyon reverification,per 820316 telcon. (4 page(s), 3/19/1982)
- ML20136C187 - Diablo Canyon project team organization. (14 page(s), 8/13/1982)
- ML20136B285 - Draft Commission paper recommending approval of transmittal of encl 10CFR50.54(f) ltr to util re error in seismic design of equipment & piping in containment annulus.Related documentation encl. (198 page(s), 12/10/1981)
- ML20136E550 - Forwards revised testimony for facility design QA hearing to conform to std format requirements. (1 page(s), 10/12/1983)
- ML20136B417 - Forwards comments on "Adjunct Program for Evaluation of Const QA," per 820914 request.General approach & scope appropriate & consistent w/previous recommendations. (3 page(s), 10/1/1982)
- ML20136B361 - Diablo Canyon project organization. (1 page(s), 4/20/1982)
- ML20136B298 - Forwards RF Reedy,Inc QA rept on PG&E & 820312 ltr to Denton. (1 page(s), 3/12/1982)
- ML20136B293 - Notifies that ninth progress rept on seismic verification program will be issued on 820315. (86 page(s), 3/12/1982)
- ML20136E236 - Requests review of all RF Reedy QA audit repts by 820402. Repts could have important bearing on scope of work required of util. (1 page(s), 3/29/1982)
- ML20136B336 - "Comments on RF Reedy,Inc,QA Audit Rept on Safety-Related Activities Performed by PG&E Prior to June 1978." (22 page(s), 4/15/1982)
- ML20136B313 - Requests review of encl Teledyne Engineering Svcs 820402 document re Phase I program mgt plan for IDVP at plant to assure document meets three NRC objectives.Results should be provided by 820419.W/o encl. (2 page(s), 4/12/1982)
- ML20136B616 - Forwards compendium on experience of plant personnel.No licensed operator has relevant commercial licensed experience.Any ascension to power should be gradual & each stage subj to formal evaluations.Related info encl. (352 page(s), 12/23/1983)
- ML20136B238 - Predocketing QA Insp Rept P-506/74-01 on 740605-07.Procedure for engineering & design activities not formalized & procedures for design changes that originate from licensing review nonexistent. (13 page(s), 6/25/1974)
- ML20136B321 - Comments on RF Reedy,Inc repts re assessment of util QA programs & design seismic consultants,in response to recent telcons.No significant adverse findings identified. (1 page(s), 3/29/1982)
- ML20136B265 - Forwards draft "Preliminary Rept on Design Interface Review of Seismic Reverification Program" & list of insp repts addressing seismic insp activities since Jan 1978.Review results of implementation of insp requirements also encl. (6 page(s), 9/30/1981)
- ML20136E554 - Revised testimony of WP Haass on Governor Deukmejian & Joint Intervenor Contentions 6 & 8 re QA design. (5 page(s), 10/12/1983)