Vogtle Electric Generating Plant, Units 3 and 4, Updated Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Bevond-Desiqn-Basis External Events (Order Number
Accession Number: ML20136A453
Date Released: Tuesday, May 26, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20136A454 - Vogtle Electric Generating Plant, Units 3 and 4, Updated Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Bevond-Desiqn-Basis External Events (5 page(s), 5/15/2020)
- ML20136A457 - Vogtle Electric Generating Plant, Units 3 and 4, Affidavit (4 page(s), 5/15/2020)
- ML20136A456 - Vogtle Electric Generating Plant, Units 3 and 4, Updated Flex Plan Nuclear Regulatory Commission Order EA-12-049 Strategies for Beyond Design Basis External Events (57 page(s), 4/30/2020)