Home > NRC Library > ADAMS Public Documents
Second partial response to FOIA request for documents. Forwards documents listed in app C.Documents also available in PDR.
Accession Number: ML20135B362
Date Released: Monday, October 28, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20135B359 - Second partial response to FOIA request for documents. Forwards documents listed in app C.Documents also available in PDR. (6 page(s), 2/21/1997)
- ML20135B671 - Responds to 950526 ltr concerning role of "cleaning team" referred to in decommissioning plan. (5 page(s), 6/6/1995)
- ML20135B628 - "Site Characterization Plan Engelhard Corp Cleveland,OH," May 1995. (80 page(s), 5/31/1995)
- ML20135B787 - Discusses misunderstanding about involvement in Engelhard re remediation efforts underway. (3 page(s), 8/30/1995)
- ML20135B619 - "Radiological Control Plan" for Engelhard Corp,rev 0. (78 page(s), 5/31/1995)
- ML20135B580 - Forwards results of alpha spectrometry analysis,performed on soil samples collected from Chevron-Englehard Corp in Cleveland,OH.Soil analysis indicates radiological contaminant processed natural U. (2 page(s), 4/20/1995)
- ML20135B656 - Submits documents in duplicate relative to decomtamination of pavement & soils surrounding bldg G-1 pursuant to 950221 ltr. (1 page(s), 5/30/1995)
- ML20135B427 - "The Building 'C' Site Assessment Rept." (129 page(s), 7/31/1997)
- ML20135B852 - "Site Characterization Plant (Phase II) Engelhard Corp, Cleveland,OH," October 1995. (15 page(s), 10/31/1995)
- ML20135B861 - Forwards copy of procedure Foster Wheeler will be using for pipe decontamination at Harshaw Chemical facility located in Cleveland,OH.Method selected for pipe decontamination will be vacuum blasting.W/o encl. (2 page(s), 11/17/1995)
- ML20135B402 - Forwards copy of bldg "C" site assessment rept dtd July 1992 for review prior to NRC proposed 921220-21 site visit. Arrangements for conference call can be made after reviewing rept. (1 page(s), 12/13/1993)
- ML20135B486 - "Decontamination Plan for Engelhard Corp Pavement & Soils Areas Surrounding Bldg G-1 1000 Harvard Ave,Cleveland,OH." (45 page(s), 12/13/1994)
- ML20135B650 - Forwards response to NRC comments on previously submitted decommissioning & demolition plan & two copies of site specific radiological health & safety plan. (18 page(s), 5/18/1995)
- ML20135B765 - Trip rept of 950725 visit to Engelhard Corp,1000 Harvard Ave,Cleveland,OH re progress of characterization/remediation work. (4 page(s), 8/2/1995)
- ML20135B878 - Forwards copy of procedure Foster Wheeler Environmental Corp will be using for verification of pipe decontamination at Harshaw Chemical facility.Pipe will be decontaminated by vaccum blasting. (1 page(s), 11/15/1995)
- ML20135B850 - Informs that Koh & Assoc completed preliminary assessment of contamination in pavement/soils surrounding bldg G-1 & forwards phase II site characterization plan which will further delineate extent of contamination. (1 page(s), 10/6/1995)
- ML20135B986 - Informs that review of "Baghouse & Conveyor Workplan" submitted on 960927 completed.Workplan found acceptable. (1 page(s), 10/16/1996)
- ML20135B536 - Submits documents that attest to fact that radiological contamination not natural U but purified U w/o long-lived daughters. (7 page(s), 2/13/1995)
- ML20135B857 - Informs that review of "Site Characterization Plan (Phase II)" submitted by 951006 ltr completed.Plan found acceptable & have no additional questions. (1 page(s), 10/19/1995)
- ML20135B947 - Responds to 960703 ltr re special inspection conducted by GM McCann on 960522 & 960621 telcon.Field portion of decommissioning project temporary suspended while resolving issues of waste disposal & funding w/DOE. (4 page(s), 7/31/1996)
- ML20135B574 - Discusses why NRC did not take lead in decommissioning of Engelhard site. (2 page(s), 3/1/1995)
- ML20135B541 - Forwards brief chronology & current status on Chevron & Engelhard. (5 page(s), 2/16/1995)
- ML20135C007 - Submits update on former Harshaw Chemical Bldg,Plant "C" in Cleveland,OH. (4 page(s), 1/29/1997)
- ML20135C034 - Forwards request from Region III to determine if NRC has any regulatory authority over Chevron Corp Plant C site on Harvard Ave in Cleveland,OH. (1 page(s), 6/21/1993)
- ML20135B813 - Expresses appreciation for clarification re NRC involvement in Engelhard & Chevron. (1 page(s), 8/30/1995)
- ML20135C030 - Requests assistance in determining if NRC has any regulatory authority over Chevron plant C on Harvard Ave,Cleveland,OH. (6 page(s), 6/7/1993)
- ML20135C050 - Informs that file number for Chevron Plant C case project code 687. (1 page(s), 9/13/1994)
- ML20135B888 - "Piping Decontamination Procedure," rev 1.0. (6 page(s), 11/1/1995)
- ML20135B775 - Discusses conversation w/B Potter from Chevron re Harvard Ave,Cleveland,site cleanup. (1 page(s), 8/29/1995)
- ML20135B451 - "Decommissioning Plan for Plant C 1000 Harvard Ave Cleveland,OH." (47 page(s), 11/29/1994)
- ML20135B983 - Forwards Engelhard radiological control plan & workplan for removal of baghouse & conveyor,in response to 960703 request. (1 page(s), 9/27/1996)
- ML20135B745 - Informs that review of 950530 submittal of site characterization plan & health & safety plan for characterization & remediation of soils & paved areas surrounding bldg G-1,1000 Harvard Ave completed. (1 page(s), 6/23/1995)
- ML20135B800 - Discusses involvement w/Engelhard. (1 page(s), 8/17/1995)
- ML20135B731 - Expresses appreciation for meeting on 950608 & forwards supporting reference "Use of One-sided Tolerance Tests for Surveys During Decontamination & Decommissioning." (12 page(s), 6/21/1995)
- ML20135B515 - Forwards new copy of branch technical position on site characterization for decommissioning Harshaw chemical bldg "C" site due to coping error.W/o encl. (1 page(s), 2/9/1995)
- ML20135B686 - Trip rept of 950613 visit to Engelhard Corp site at 1000 Harvard Ave,Cleveland,OH to familiarize site prior to review & approval of remediation plan. (1 page(s), 6/16/1995)
- ML20135B808 - Requests to be contacted if need to engage DOE headquarters colleagues. (1 page(s), 8/29/1995)
- ML20135B975 - "Work Plan For Dismantlement & Removal of Filter Baghouse & Conveyor Assembly Located in G-1 Bldg At 1000 Harvard Ave, Cleveland,OH," Sept 1996,Rev 0. (19 page(s), 9/30/1996)
- ML20135B364 - "Radiation Worker Training Course." (95 page(s), 2/21/1997)
- ML20135B940 - Submits description of temporary treatment sys used to treat approx 1,500 gallons of laundry water in reply to 960502 conversation. (10 page(s), 5/16/1996)
- ML20135B928 - Responds to NRC 951024-25 special inspection.Corrective actions:form 5 will be provided to employees upon request, prior to leaving jobsite.Health & safety coordinator will evaluate incoming personnel to determine if bioassay needed. (4 page(s), 1/10/1996)