Forwards second RAI to complete review of licensee 951127 request to utilize risk-informed IST program at plant,Units 1 & 2.
Accession Number: ML20135B349
Date Released: Thursday, May 28, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20135F833 - Forwards second RAI to complete review of licensee 951127 request to utilize risk-informed IST program at plant,Units 1 & 2. (13 page(s), 3/12/1997)
- ML20135B346 - Expands upon some of data developed in draft ltr rept ORNL/NRC/LTR-96-32, "Characterization Update of Pump & Related Equipment Failure Experience in Nuclear Power Industry (1994-1995)." (6 page(s), 11/22/1996)
- ML20135B423 - Forwards summary rept, "Evaluation of Candidate LSSC Check Valves for Risk Based IST Extension at Comanche Peak Units 1,2." (2 page(s), 1/9/1997)
- ML20135B433 - "Evaluation of Candidate LSSC Check Valves for Risk Based IST Extension at Comanche Peak Units 1,2." (21 page(s), 1/6/1997)
- ML20135B355 - Forwards summary rept "Exam of Motor-Operated Valve Failures W/Application to Increasing Surveillance Testing Period at Texas Utility Co,Comanche Peak,Units 1 & 2." (2 page(s), 1/8/1997)
- ML20135B382 - "Exam of Motor-Operated Valve Failures W/Application to Increasing Surveillance Testing Period at Texas Utilities Co. Comanche Peak,Units 1 & 2." (9 page(s), 2/24/1997)