NRC Logo

Home > NRC Library > ADAMS Public Documents

Informs of addl changes to amend to license NPF-62,revising TS 3.3.4.1, "End of Cycle Recirculation Pump Trip Instrumentation," to delete SR 3.3.4.1.6 which requires RPT breaker interruption time to be determined every 60 months.

Accession Number: ML20134C159

Date Released: Wednesday, May 27, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer