Home > NRC Library > ADAMS Public Documents
Forwards response to draft SER or FSAR Item 12.3-5 re typical traffic patterns,consisting of 18 oversize initial architectural drawings.Info will not be incorporated into radiation zone drawings.
Accession Number: ML20133J303
Date Released: Friday, October 2, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20133J301 - Forwards response to draft SER or FSAR Item 12.3-5 re typical traffic patterns,consisting of 18 oversize initial architectural drawings.Info will not be incorporated into radiation zone drawings. (3 page(s), 10/12/1985)
- ML20262G178 - "Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 10 Ft." (1 page(s), 10/10/1985)
- ML20262G183 - "Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 19 Ft & 51 Ft 6 Inches." (1 page(s), 10/10/1985)
- ML20262G187 - "Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 21 Ft,23 Ft & 29 Ft." (1 page(s), 10/10/1985)
- ML20262G192 - "Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 35 Ft & 41 Ft." (1 page(s), 10/10/1985)
- ML20262G196 - "Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 60 Ft." (1 page(s), 10/10/1985)
- ML20262G200 - "Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 72 Ft,74 Ft & 60 Ft." (1 page(s), 10/10/1985)
- ML20262G204 - "Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 86 Ft." (1 page(s), 10/10/1985)
- ML20262G207 - "Architectural:Fuel Handling Building Egress Path & Signage Program Floor Plan at El -12 Ft,-13 Ft,-21 Ft,-29 Ft & 4 Ft." (1 page(s), 10/10/1985)
- ML20262G209 - "Architectural:Fuel Handling Building Egress Path & Signage Program Floor Plan at El 30 Ft." (1 page(s), 10/10/1985)
- ML20262G213 - "Architectural:Fuel Handling Building Egress Path & Signage Program Floor Plan at El 42 Ft 6 Inches & 53 Ft 3 Inches." (1 page(s), 10/10/1985)
- ML20262G216 - "Architectural:Fuel Handling Building Egress Path & Signage Program Floor Plan at El 68 Ft." (1 page(s), 10/10/1985)
- ML20262G225 - "Architectural:Turbine Generator Building Egress Path & Signage Program Floor Plan at El 29 Ft." (1 page(s), 10/10/1985)
- ML20262G228 - "Architectural:Turbine Generator Building Egress Path & Signage Program Floor Plan at El 55 Ft." (1 page(s), 10/10/1985)
- ML20262G232 - "Architectural:Turbine Generator Building Egress Path & Signage Program Floor Plan at El 83 Ft." (1 page(s), 10/10/1985)
- ML20262G234 - "Architectural:Diesel Generator Bldg Egress Path & Signage Program Floor Plan at El 25 Ft,55 Ft & 82 Ft." (1 page(s), 10/10/1985)
- ML20262G238 - "Architectural:Isolation Valve Cubicle Building Egress Path & Signage Program Fl Plan at 34 Ft,44 Ft,51 Ft 6 Inches,58 Ft 6 Inches,65 Ft 6 Inches,86 Ft & 10 Ft." (1 page(s), 10/10/1985)
- ML20262G242 - "Architectural:MEAB & FHB Egress Path & Signage Program Physical Barrier at Stairs." (1 page(s), 10/10/1985)
- ML20262G246 - "Architectural:TGB DGB IVC & MEAB Egress Path & Signage Program Emergency Stair at MAB & DGB." (1 page(s), 10/10/1985)