NRC Logo

Home > NRC Library > ADAMS Public Documents

Requests temporary relief from ASME Boiler & Pressure Vessel Code Section XI requirement IWA-5250,to delay repair of weld on safety injection recirculation piping until next outage of sufficient duration.

Accession Number: ML20133B014

Date Released: Tuesday, May 26, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer