Home > NRC Library > ADAMS Public Documents
Forwards amends 177 & 164 to licenses DPR-39 & DPR-48, respectively & safety evaluation.Amends allow Commonwealth Edison to control reactor coolant sys pressure & temperature limits for heatup,cooldown,low temp operation & testing.
Accession Number: ML20132F504
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20132F498 - Forwards amends 177 & 164 to licenses DPR-39 & DPR-48, respectively & safety evaluation.Amends allow Commonwealth Edison to control reactor coolant sys pressure & temperature limits for heatup,cooldown,low temp operation & testing. (3 page(s), 12/20/1996)
- ML20132F506 - Amends 177 & 164 to licenses DPR-39 & DPR-48,respectively, allowing ComEd to control reactor coolant sys pressure & temp limits for heatup,cooldown,low temp operation & hydrostatic testing. (27 page(s), 12/20/1996)
- ML20132F511 - Safety evaluation supporting amends 177 & 164 to licenses DPR-39 & DPR-48,respectively. (16 page(s), 12/20/1996)