NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards safety evaluation concluding that breakout of Spirit Lake would not affect safe operation of plant.Outlet tunnel constructed to reduce threat of potential debris dam failure & breakout of lake.

Accession Number: ML20132D308

Date Released: Sunday, October 27, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer