Response to FOIA request for documents used for NUREG-0999. App A documents in PDR.App B documents encl.App C & D documents copyrighted.App E documents withheld (ref FOIA Exemption 4).
Accession Number: ML20132A685
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20132E820 - Response to FOIA request for documents used for NUREG-0999. App A documents in PDR.App B documents encl.App C & D documents copyrighted.App E documents withheld (ref FOIA Exemption 4). (9 page(s), 6/6/1985)
- ML20132F393 - Initiates & provides direction for NRR review for major issues raised by British in application of PWR technology in Sizewell B. (32 page(s), 10/25/1982)
- ML20132F302 - Undated "Sizewell B,Review By HM Nuclear Installations Inspectorate:Suppl 5,Fuel Clad Ballooning." (31 page(s), 6/6/1985)
- ML20132F344 - "Sizewell B,Review By HM Nuclear Installations Inspectorate: Suppl 7,External Hazards - Earthquake." (14 page(s), 3/31/1983)
- ML20132F177 - "Sizewell B Power Station Public Inquiry," Vols 1 & 2 & Apps H,J,L & M. (530 page(s), 4/30/1982)
- ML20132F430 - Forwards NRC Sizewell evaluation draft rept for further comment.Encl includes corrections from Dec meetings.Final rept will be issued by 830311.W/o encl. (1 page(s), 2/23/1983)
- ML20132F282 - "Sizewell B,Review By HM Nuclear Installations Inspectorate: Suppl 4,Steam Generator Tube Integrity." (24 page(s), 3/31/1983)
- ML20132B572 - Forwards NUREG-0999 re Sizewell B evaluation.W/o encl. (1 page(s), 5/27/1983)
- ML20132F481 - Forwards NUREG-0999,NRC rept on Sizewell B evaluation. W/o encl. (1 page(s), 5/27/1983)
- ML20132F410 - Forwards review of Item 7, "Increased Equipment Redundancy," of Encl 1 to HR Denton 821025 memo re design comparison between SNUPPS & Sizewell B nuclear plants. (22 page(s), 11/24/1982)
- ML20132F258 - "Sizewell B,Review By HM Nuclear Installations Inspectorate: Suppl 2,Safety Analysis." (21 page(s), 12/31/1982)
- ML20132F156 - "Safety Assessment Principal for Nuclear Power Reactors." (49 page(s), 4/30/1979)
- ML20132F273 - "Sizewell B,Review By HM Nuclear Installations Inspectorate: Suppl 3,External Hazards - Aircraft Crash." (13 page(s), 3/31/1983)
- ML20132F333 - "Sizewell B,Review By HM Nuclear Installations Inspectorate: Suppl 6,Reactor Protection Sys." (50 page(s), 1/31/1983)
- ML20132F215 - "Sizewell B Review by HM Nuclear Installations Inspectorate of Preconst Safety Rept." (96 page(s), 12/31/1982)
- ML20132F377 - "Degraded Core Accidents for Sizewell PWR:Sensitivity Analysis of Radiological Consequences." (131 page(s), 10/31/1982)
- ML20132F225 - "Sizewell B,Review By HM Nuclear Installations Inspectorate: Suppl 1,Degraded Core Analysis." (48 page(s), 11/30/1982)
- ML20132F209 - "Pretest Prediction & Post-Test Analysis of PWR Fuel Rod Ballooning in MT-3 In-Pile LOCA Simulation Experiment in NRM Reactor." (35 page(s), 6/30/1982)
- ML20132F367 - Paper entitled, "Current Central Electricity Generating Board Safety Policy & Criteria," presented at IAEA 820913-17 intl conference on nuclear power experience,in Vienna, Austria. (15 page(s), 9/13/1982)
- ML20132F194 - Issue A of "PWR Design Safety Guidelines." (155 page(s), 4/30/1982)
- ML20132F165 - Revised "Design Safety Criteria for Central Electricity Generating Board Nuclear Power Stations." (27 page(s), 3/31/1982)
- ML20132E840 - Provides results of meetings w/UKAEA & UNKII re fuel clad ballooning.Development of sausages highly improbable. (12 page(s), 7/13/1977)
- ML20132F508 - "Causes of Larger Degraded Core Frequencies in Earlier Safety Studies Compared W/Sizewell B." (25 page(s), 1/31/1984)
- ML20132A682 - Forwards safety evaluation accepting 1981 version of Westinghouse large break ECCS evaluation model.Requests publication of WCAP-9200 & WCAP-9221 within 90 days. (2 page(s), 12/1/1981)
- ML20132F098 - Minutes of 771111 workshop on simulation of nuclear fuel rods in LOCA.Viewgraphs encl. (2 page(s), 3/31/1978)
- ML20132F115 - Trip rept of participation in listed meetings re fuel rod behavior & Zircaloy cladding. (23 page(s), 8/7/1978)
- ML20132B510 - Concurs w/Draft 2 of Sizewell B evaluation rept. (1 page(s), 2/8/1983)
- ML20132F495 - "Sizewell B,Review By HM Nuclear Installations Inspectorate: Suppl 12,ALARA Strategy for Dose Reduction." (45 page(s), 7/31/1983)
- ML20132E858 - Speech entitled, "Zircaloy Fuel Clad Ballooning Tests at 900-1,070K in Stea,Preliminary Results," presented at 5th Water Reactor Safety Info Meeting in Sept 1977 in Gaithersburg,MD. (31 page(s), 7/30/1977)
- ML20132F385 - Forwards Sizewell B review package & requests attendance at 821101 meeting in Bethesda,MD to discuss review. (2 page(s), 10/29/1982)
- ML20132F348 - "Sizewell B,Review By HM Nuclear Installations Inspectorate: Suppl 8,External Hazards - Fire." (30 page(s), 3/31/1983)
- ML20132F452 - Forwards NRC Sizewell evaluation draft rept for further comment.Encl includes corrections from Dec meetings.Final rept will be issued by 830311.W/o encl. (1 page(s), 2/23/1983)
- ML20132F139 - Forwards info resulting from June 1978 meeting on axially extended fuel clad ballooning. (190 page(s), 9/15/1978)
- ML20132A688 - Safety evaluation accepting 1981 version of Westinghouse large break ECCS evaluation model. (30 page(s), 12/1/1981)