Home > NRC Library > ADAMS Public Documents
Concludes that model MK 1.0 transmission gauge acceptable for licensing purposes,per 950920 application & subsequent ltrs.
Accession Number: ML20129K366
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20129K365 - Concludes that model MK 1.0 transmission gauge acceptable for licensing purposes,per 950920 application & subsequent ltrs. (1 page(s), 11/1/1996)
- ML20129K368 - Forwards label for Betacontrol of America,Inc file,per request. (3 page(s), 10/4/1996)
- ML20129K369 - Responds to 960920 telcon re addl info for amend to Registration for Registry NR-122-D-101-S. (2 page(s), 9/20/1996)
- ML20129K370 - Responds to 960917 RAI for amend to Registration for Registry NR-122-D-101-S. (18 page(s), 9/19/1996)
- ML20129K371 - Responds to 960809 RAI for amend to registration for registry NR-122-D-101-S. (3 page(s), 8/12/1996)
- ML20129K375 - "Service Manual." (61 page(s), 11/1/1996)
- ML20129K381 - "Operation Manual." (46 page(s), 11/1/1996)
- ML20129K382 - "QA/QC Procedures for Generally Licensed Devices." (4 page(s), 11/1/1996)
- ML20129K384 - "General License Document Amend to Operations Manual." (24 page(s), 11/1/1996)
- ML20129K393 - Forwards preliminary copy of GL label until engineering drawing detailing dimensions & other info about label has been received,per 960715 telcon. (3 page(s), 7/15/1996)
- ML20129K394 - Submits additional questions re Batacontol application for general license. (2 page(s), 6/17/1996)
- ML20129K398 - Submits points discussed during 960328 telcon. (2 page(s), 3/28/1996)
- ML20129K402 - Submits response to request re changes to registration certificate NR-122-D-101-s. (10 page(s), 5/28/1992)