NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards safety evaluation supporting response to Generic Ltr 81-21 re reactor vessel upper head steam formation during natural circulation cooldown.Cooldown to DHR sys actuation can be performed in 8 h w/o void formation.

Accession Number: ML20129B877

Date Released: Friday, May 22, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer