Home > NRC Library > ADAMS Public Documents
Forwards Gibbs & Hill 840611 Design Procedure DP-1, "Seismic Category I Electrical Cable Tray Supports,Comanche Peak Steam Electric Station Units 1 & 2," per response to CYGNA Phase 1 & 2 independent assessment program.
Accession Number: ML20128K080
Date Released: Thursday, May 21, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20128K075 - Forwards Gibbs & Hill 840611 Design Procedure DP-1, "Seismic Category I Electrical Cable Tray Supports,Comanche Peak Steam Electric Station Units 1 & 2," per response to CYGNA Phase 1 & 2 independent assessment program. (3 page(s), 9/11/1984)
- ML20128K095 - Design Procedure DP-1, "Seismic Category I Electrical Cable Tray Supports,Comanche Peak Steam Electric Station,Units 1 & 2." (9 page(s), 6/11/1984)
- ML20128K102 - Responds to two remaining questions re NRC review of independent assessment program,Phases 1 & 2,concerning cable tray const drawings.Discrepancies between design & fabrication drawings encl.NH Williams 840618 ltr encl. (18 page(s), 3/8/1985)