NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards safety evaluation re leak on core spray in-vessel annulus piping & concludes that plant can be safely operated for one fuel cycle w/o repairing leak at listed 1/4-inch fillet weld.

Accession Number: ML20128F115

Date Released: Thursday, May 21, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer