NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 0 to "IPE Rept for Trojan Nuclear Power Plant in Response to GL 88-20." Certifies that individual reviews performed to ensure technical adequacy of IPE & validation of results.

Accession Number: ML20127M121

Date Released: Sunday, October 27, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer