Forwards info re differing professional opinion of TG Dunning on NRC approach to implementation & enforcement of regulatory & TS requirements for electrical power sys in nuclear power plants.Documents listed in encl app.
Accession Number: ML20127M067
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20127M063 - Forwards info re differing professional opinion of TG Dunning on NRC approach to implementation & enforcement of regulatory & TS requirements for electrical power sys in nuclear power plants.Documents listed in encl app. (2 page(s), 12/28/1992)
- ML20127M073 - Provides differing professional opinion w/NRC approach to implementation & enforcement of regulatory & TS requirements for electrical power sys in nuclear power plants (directive 6.2). (30 page(s), 6/10/1992)
- ML20127M080 - Requests recommendation & basis for recommendation on differing professional opinion on regulatory & TS requirements for electrical power sources.Provisions of 10CFR50.109 should be considered. (1 page(s), 6/12/1992)
- ML20127M085 - Discusses lack of date for goal in 920612 memo for panel to render recommendation on differing professional opinion of author on regulatory & TS requirements for electrical power sources. (2 page(s), 6/16/1992)
- ML20127M089 - Advises that any documents related to differing professional opinion of author on regulatory & TS requirements for electrical power sources will be provided,in ref to 920612 memo requesting recommendation on subj. (2 page(s), 6/16/1992)
- ML20127M094 - Advises that J Cutchin asked to provide legal svcs in connection w/differing professional opinion of TG Dunning on regulatory & TS requirements for electrical power sources. (1 page(s), 6/17/1992)
- ML20127M097 - Provides status rept on differing professional opinion of TG Dunning.Deliberations nearing completion.Rept being finalized.Formal rept expected no later than 920817. (1 page(s), 8/3/1992)
- ML20127M109 - Discusses review of differing professional opinion submitted by TG Dunning on regulatory & TS requirements for electrical power sources.Staff should clarify position on GDC w/respect to RHR sys during cold shutdown & refueling. (8 page(s), 8/14/1992)
- ML20127M115 - Discusses review by panel on differing professional opinion of TG Dunning re regulatory & TS requirements for electrical power sources in nuclear power plants.Necessary actions listed. (1 page(s), 9/11/1992)
- ML20127M127 - Advises that review of panel on TG Dunning differing professional opinion re regulatory & TS requirements for electrical power sources complete & discusses recommendations.Weekly info rept input encl. (3 page(s), 9/11/1992)