Home > NRC Library > ADAMS Public Documents
Forwards nonradiological NPDES permit violation repts from Nov 1984 to Apr 1985,as submitted to State of MI.Also forwards three repts of oil,salt or polluting matl loss & transfer oil leak followup rept for same period.
Accession Number: ML20126M704
Date Released: Tuesday, May 19, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20126M701 - Forwards nonradiological NPDES permit violation repts from Nov 1984 to Apr 1985,as submitted to State of MI.Also forwards three repts of oil,salt or polluting matl loss & transfer oil leak followup rept for same period. (2 page(s), 5/31/1985)
- ML20126M710 - NPDES noncompliance notification:on 850415,monitoring point Outfall 00G (tank T-41) weekly grab sample for oil & grease exceeded daily max.Caused by abnormal high flow of water through turbine sump. (2 page(s), 5/6/1985)
- ML20126M714 - NPDES noncompliance notification:on 850228,monthly average oil & grease exceeded limit of 15 mg/l.Caused by apparent malfunction of new oil/water separator.Separator cleaned & oil skimming weir readjusted. (2 page(s), 3/19/1985)
- ML20126M719 - NPDES noncompliance notification:on 850131,monthly average oil & grease concentration measured 42 mg/l,exceeding limit of 15 mg/l.Caused by bypass of new API oil/water separator due to faulty waste oil pump.New pump installed. (2 page(s), 2/6/1985)
- ML20126M728 - NPDES noncompliance notification:on 850121 & 28,routine weekly oil & gas samples measured 50.2 mg/l & 60 mg/l, respectively,exceeding limit.Caused by bypass of new API oil/water separator due to faulty waste pump. (2 page(s), 2/4/1985)
- ML20126M750 - NPDES noncompliance notification:on 850110 & 14,routine weekly oil & grease samples measured 72.2 mg/l & 56.1 mg/l, respectively,exceeding limit.Caused by removal of new API oil/water separator from svc for maint.Returned to svc. (2 page(s), 1/21/1985)
- ML20126M769 - NPDES noncompliance notification:on 841120 & 21,turbine bldg sump flooded & oily waste treatment sys temporarily bypassed.Caused by main boiler feed pump leakage.Leakage cut to flow level turbine sump pumps could handle.W/addl repts. (16 page(s), 12/3/1984)