Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for documents re electrical cable separation deficiencies at facility.Forwards Apps A & B documents.Documents also available in PDR.
Accession Number: ML20126H338
Date Released: Wednesday, May 20, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20126H335 - Responds to FOIA request for documents re electrical cable separation deficiencies at facility.Forwards Apps A & B documents.Documents also available in PDR. (3 page(s), 4/15/1985)
- ML20126H439 - Forwards Delian Corp const self assessment corrective action evaluation rept,util response to notice of violation documented in Insp Rept 50-482/84-51 & summary of util actions re unresolved items. (22 page(s), 1/21/1985)
- ML20127B510 - Trip rept of site visit during wk of 831031 re physical arrangement & installation of electrical,instrumentation & control equipment.Compliance w/NRC design criteria confirmed. (32 page(s), 4/13/1984)
- ML20126H603 - "Wolf Creek Nuclear Generating Station Const Self Assessment Corrective Action Evaluation." (66 page(s), 1/11/1985)
- ML20127C342 - Forwards Special Const Verification Insp Rept 50-482/84-51 of voluntary const self-assessment on 841023-1102,per 840924 request,for transmittal to applicant.Transmittal ltr, potential enforcement actions & unresolved items also encl. (6 page(s), 12/11/1984)
- ML20126H482 - Responds to NRC 850103 ltr re violations noted in Insp Rept 50-482/84-51.Corrective actions:analysis of nonsafety conduits to safety cable trays & cables exiting trays performed.Results will be incorporated into FSAR. (6 page(s), 1/14/1985)
- ML20126H387 - Approves proposed change to facility FSAR Section 8.3.1.4.1.1.e. (1 page(s), 2/15/1985)