NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Reactor Containment Building Integrated Leakage Rate Test for Comanche Peak Steam Electric Station Unit 2 Final Rept," reflecting summary of Unit 2 Prestart Test Program ILRT conducted during period 920910-15.

Accession Number: ML20126C825

Date Released: Tuesday, May 19, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer