NRC Logo

Home > NRC Library > ADAMS Public Documents

Responds to 790927 ltr re FC Branchini concern over facility geologic fault seismic design & svc water pumphouse settlement.Analysis procedures for seismic design meet NRC requirements.Fault through plant site is not capable.

Accession Number: ML20125D070

Date Released: Monday, May 18, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer