Home > NRC Library > ADAMS Public Documents
Amend 39 to FSAR,Section 3.2,piping & instrumentation diagrams.Drawings encl.
Accession Number: ML20125C745
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20125C832 - "Piping & Instrumentation Diagram:Ctr Island Gas Cooling Sys,Sys 25." (1 page(s), 5/11/1978)
- ML20125C864 - "Piping & Instrumentation Diagram:Locker & Basement Areas - C.B. & A.E.B.(E) Heating & Ventilation,Sys 25." (1 page(s), 10/14/1977)
- ML20125D121 - "Piping & Instrumentation Diagram:Argon Distribution Outside Containment,Sys 82." (1 page(s), 11/9/1977)
- ML20125D006 - "Piping & Instrumentation Diagram:Low Pressure Nitrogen Distribution Section 1,Sys 82." (1 page(s), 12/6/1977)
- ML20125C904 - "Piping & Instrumentation Diagram:Main Heat Transport Loop 1,Sys 51." (1 page(s), 3/1/1978)
- ML20125C913 - "Piping & Instrumentation Diagram:Main Heat Transport Reactor Vessel,Sys 51." (1 page(s), 11/15/1977)
- ML20125D215 - "Piping & Instrumentation Diagram:Primary Argon Cover Gas Sampling Closed Loop Sys 1 & 2,Sys 85." (1 page(s), 3/9/1975)
- ML20125C867 - "Piping & Instrumentation Diagram:Containment Bldg & Auxiliary Equipment Bldg East Floor Plan,Elevation 550 Ft, Sys 26." (1 page(s), 6/21/1977)
- ML20125C859 - "Piping & Instrumentation Diagram:Control Area - C.B. & A.E.B.(E) Heating & Ventilation,Sys 25." (1 page(s), 10/1/1976)
- ML20125D338 - "Piping & Instrumentation Diagram:Multi-Purpose Sampler." (1 page(s), 3/9/1978)
- ML20125C876 - "Piping & Instrumentation Diagram:Reactor Containment Monitoring Instrumentation,Sys 27." (1 page(s), 2/17/1978)
- ML20125C778 - "Piping & Instrumentation Diagram:Radioactive Liquid Waste, Sys 23." (1 page(s), 10/20/1977)
- ML20125C960 - "Piping & Instrumentation Diagram:Main Heat Transport Loop 3,Sys 51." (1 page(s), 4/11/1978)
- ML20125C997 - "Piping & Instrumentation Diagram:NAK Cold Trap Cooling Sys, Sys 81." (1 page(s), 7/6/1977)
- ML20125C798 - "Piping & Instrumentation Diagram:Interim Decay Storage Tank Cell & Miscellaneous Cells Gas Cooling Sys,Sys 25." (1 page(s), 7/29/1977)
- ML20125C775 - "Piping & Instrumentation Diagram:Mobiltherm Sys,Sys 23." (1 page(s), 7/20/1979)
- ML20125C881 - "Piping & Instrumentation Diagram." (1 page(s), 2/17/1978)
- ML20125C856 - "Piping & Instrumentation Diagram:Interim Decay Storage Vessels Nitrogen Backup Gas Cooling Sys,Sys 25." (1 page(s), 2/9/1978)
- ML20125C982 - "Piping & Instrumentation Diagram:Sodium Receiving & Unloading Sys,Sys 81." (1 page(s), 3/13/1978)
- ML20125C847 - "Piping & Instrumentation Diagram:NA Sampling Cells & Pipeway Gas Cooling Sys,Sys 25." (1 page(s), 12/27/1977)
- ML20125C851 - "Piping & Instrumentation Diagram:Containment Work Areas Heating & Ventilation,Sys 25." (1 page(s), 10/4/1977)
- ML20125D020 - "Piping & Instrumentation Diagram:High Pressure Nitrogen Distribution in Containment,Sys 82." (1 page(s), 3/1/1978)
- ML20125C785 - "Piping & Instrumentation Diagram:Air Coolers in Containment Bldg Heating & Ventilation,Sys 25." (1 page(s), 1/27/1978)
- ML20125C970 - "Piping & Instrumentation Diagram:Main Heat Transport Second Loop 1,Dump Heat Exchanger Preheaters,Sys 51." (1 page(s), 1/5/1978)
- ML20125C794 - "Piping & Instrumentation Diagram:Heat Transport Sys Cells 1 & 2 Case Cooling,Sys 25." (1 page(s), 1/26/1976)
- ML20125D185 - "Piping & Instrumentation Diagram:Argon Seal/Purge Gas Distribution Head Compartment,Sys 82." (1 page(s), 11/30/1977)
- ML20125D104 - "Piping & Instrumentation Diagram:Low Pressure Distribution in Containment,Sys 82." (1 page(s), 3/31/1978)
- ML20125C888 - "Piping & Instrumentation Diagram:Argon Gas/Compressed Air Sys Clem." (1 page(s), 3/31/1978)
- ML20125C873 - "Piping & Instrumentation Diagram:Reactor Containment Sys 27 Miscellaneous Sys." (1 page(s), 8/2/1976)
- ML20125D138 - "Piping & Instrumentation Diagram:Cell Atmosphere Processing Sys." (1 page(s), 4/5/1977)
- ML20125C756 - "Piping & Instrumentation Diagram:Cooling Inside Containment Piping,Sys 23." (1 page(s), 11/12/1976)
- ML20125D192 - "Piping & Instrumentation Diagram:Primary Sodium Sampling Heat Transport Sys,Sys 85." (1 page(s), 10/9/1977)
- ML20125C962 - "Piping & Instrumentation Diagram:Main Heat Transport Second Loop Dump Heat Exchanger Loop 3,Sys 51." (1 page(s), 1/25/1978)
- ML20125C911 - "Piping & Instrumentation Diagram:Main Heat Transport Second Loop 1,Sys 51." (1 page(s), 1/3/1978)
- ML20125D297 - "Piping & Instrumentation Diagram:Primary Argon Cover Gas Sampling Closed Loop Sys 3 & 4,Sys 85." (1 page(s), 9/1/1978)
- ML20125C825 - "Piping & Instrumentation Diagram:Control Rod Drive Mechanism Gas Cooling,Sys 25." (1 page(s), 12/9/1977)
- ML20125C789 - "Piping & Instrumentation Diagram:Reactor Cavity Gas Cooling Sys 25." (1 page(s), 7/14/1977)
- ML20125D117 - "Piping & Instrumentation Diagram:Radioactive Argon Processing Sys." (1 page(s), 3/9/1977)
- ML20125C995 - "Piping & Instrumentation Diagram:Interim Decay Storage Processing Sys,Sys 81." (1 page(s), 4/12/1978)
- ML20125D200 - "Piping & Instrumentation Diagram:Primary Sodium Sampling Closed Loop Sys Number 1,Sys 85." (1 page(s), 3/3/1978)
- ML20125C806 - "Piping & Instrumentation Diagram:Closed Loop Cells 3 & 4 Gas Cooling,Sys 25." (1 page(s), 9/9/1975)
- ML20125D206 - "Piping & Instrumentation Diagram:Primary Sodium Sampling Closed Loop Sys Number 3,Sys 85." (1 page(s), 1/19/1977)
- ML20125C843 - "Piping & Instrumentation Diagram:NA Sampling Cells & Pipeway Gas Cooling Sys,Sys 25." (1 page(s), 7/15/1977)
- ML20125C986 - "Piping & Instrumentation Diagram:Reactor Primary Sodium Processing Sys,Sys 81." (1 page(s), 3/17/1978)
- ML20125D107 - "Piping & Instrumentation Diagram:Radioactive Argon Processing Sys,Sys 82." (1 page(s), 3/3/1978)
- ML20125C763 - "Piping & Instrumentation & Flow Diagram:Instrument Air-to- Dump Heat Exchangers Svc Piping,Sys 23." (1 page(s), 1/31/1978)
- ML20125C761 - "Piping & Instrumentation Diagram:Fuel Oil-to-Heaters Preheaters Svc Piping,Sys 23." (1 page(s), 3/10/1978)
- ML20125D225 - "Piping & Instrumentation Diagram:Primary Argon Cover Gas Sampling Heat Transport Sys,Sys 85." (1 page(s), 3/9/1978)
- ML20125C802 - "Piping & Instrumentation Diagram:Closed Loop Cells 1 & 2 Gas Cooling,Sys 25." (1 page(s), 12/22/1976)
- ML20125C754 - "Piping & Instrumentation Diagram:Breathing Air Svc Piping, Sys 23." (1 page(s), 2/7/1978)
- ML20125C751 - "Piping & Instrumentation Diagram:Instrument Air Svc Piping, Sys 23." (1 page(s), 6/13/1978)
- ML20125D009 - "Piping & Instrumentation Diagram:Argon Supply & Reactor Distribution,Sys 82." (1 page(s), 8/3/1977)
- ML20125D202 - "Piping & Instrumentation Diagram:Primary Sodium Sampling Closed Loop Sys Number 2,Sys 85." (1 page(s), 3/2/1978)
- ML20125D156 - "Piping & Instrumentation Diagram:Argon Distribution Primary Heat Transport Sys Loop 2,Sys 82." (1 page(s), 10/25/1977)
- ML20125D130 - "Piping & Instrumentation Diagram:Cell Atmosphere Processing Sys,Sys 82." (1 page(s), 5/26/1978)
- ML20125D164 - "Piping & Instrumentation Diagram:Argon Distribution Primary Heat Transport Sys Loop 3,Sys 82." (1 page(s), 1/25/1978)
- ML20125C949 - "Piping & Instrumentation Diagram:Main Heat Transport Loop 2,Sys 51." (1 page(s), 3/24/1978)
- ML20125D140 - "Piping & Instrumentation Diagram:Low Pressure Nitrogen Distribution Section 2,Sys 82." (1 page(s), 3/2/1978)
- ML20125D125 - "Piping & Instrumentation Diagram:High Pressure Argon Distribution in Containment,Sys 82." (1 page(s), 3/6/1978)
- ML20125C782 - "Piping & Instrumentation Diagram:Reactor Containment & Heating & Ventilation Sys." (1 page(s), 2/1/1978)
- ML20125D212 - "Piping & Instrumentation Diagram:Primary Sodium Sampling Closed Loop Sys Number 4,Sys 85." (1 page(s), 9/30/1977)
- ML20125D132 - "Piping & Instrumentation Diagram:Cell Atmosphere Processing Sys,Sys 82." (1 page(s), 7/7/1977)
- ML20125C991 - "Piping & Instrumentation Diagram:Reactor Secondary Sodium Processing Sys,Sys 81." (1 page(s), 1/31/1978)
- ML20125D113 - "Piping & Instrumentation Diagram:Radioactive Argon Processing Sys,Sys 82." (1 page(s), 3/8/1977)
- ML20125C977 - "Piping & Instrumentation Diagram:Main Heat Transport Second Loop 3,Dump Heat Exchanger Preheaters,Sys 51." (1 page(s), 4/7/1978)
- ML20125C821 - "Piping & Instrumentation Diagram:Reactor Head Compartment Gas Cooling,Sys 25." (1 page(s), 1/11/1977)
- ML20125C974 - "Piping & Instrumentation Diagram:Main Heat Transport Second Loop 2,Dump Heat Exchanger Preheaters,Sys 51." (1 page(s), 1/25/1978)
- ML20125D328 - "Piping & Instrumentation Diagram:Auxiliary Plugging Temperature Indicator." (1 page(s), 7/22/1977)
- ML20125C953 - "Piping & Instrumentation Diagram:Main Heat Transport Second Loop Dump Heat Exchanger Loop 2,Sys 51." (1 page(s), 12/20/1977)
- ML20125C808 - "Piping & Instrumentation Diagram:Pipeways for Cells 1,2,3 & 4 Gas Cooling,Sys 25." (1 page(s), 1/24/1978)
- ML20125C772 - "Piping & Instrumentation & Flow Diagram:Instrument Air-to-Dump Heat Exchangers Svc Piping,Sys 23." (1 page(s), 1/13/1978)
- ML20125C814 - "Piping & Instrumentation Diagram:Interim Examination & Maint Cell & Fuel Subassembly Gas Cooling Sys,Sys 25." (1 page(s), 4/4/1978)
- ML20125D016 - "Piping & Instrumentation Diagram:Argon Distribution Outside Containment,Sys 82." (1 page(s), 7/11/1977)
- ML20125C817 - "Piping & Instrumentation Diagram:Heat Transport Sys Cell 3 & Miscellaneous Cells Gas Cooling Sys,Sys 25." (1 page(s), 3/1/1979)
- ML20125D305 - "Piping & Instrumentation Diagram:Plugging Temperature Indicator Module." (1 page(s), 6/29/1977)
- ML20125D316 - "Piping & Instrumentation Diagram:Secondary Sodium Sampling Package Distribution Loop." (1 page(s), 12/20/1972)
- ML20125D012 - "Piping & Instrumentation Diagram:Argon Distribution Primary Heat Transport Sys Loop 1,Sys 82." (1 page(s), 4/14/1977)
- ML20125C746 - "Notes & Safety Function Symbolism." (1 page(s), 11/30/1979)
- ML20125D170 - "Piping & Instrumentation Diagram:Argon Distribution Outside Containment,Sys 82." (1 page(s), 5/26/1978)
- ML20125D177 - "Piping & Instrumentation Diagram:High Pressure Nitrogen Distribution Outside Containment,Sys 82." (1 page(s), 3/16/1978)
- ML20125D002 - "Piping & Instrumentation Diagram:NAK Interim Decay Storage Cooling Sys,Sys 81." (1 page(s), 8/3/1977)
- ML20125C829 - "Piping & Instrumentation Diagram:Low Level Flux Monitors Gas Cooling Sys,Sys 25." (1 page(s), 6/8/1978)