Home > NRC Library > ADAMS Public Documents
Final response to FOIA request for documents re AEC staff repts to ACRS.App A documents already in PDR.Forwards documents listed in App B which are being made avaliable in PDR.Request also referred to other listed federal agencies.
Accession Number: ML20125A422
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20128E705 - Final response to FOIA request for documents re AEC staff repts to ACRS.App A documents already in PDR.Forwards documents listed in App B which are being made avaliable in PDR.Request also referred to other listed federal agencies. (5 page(s), 6/11/1992)
- ML20128F400 - Lists agenda for 700107 meeting of facility subcommittee including post-accident hydrogen generation,emergency heat removal sys NPSN question presentation,primary sys instrument lines & MSL isolation valve performance. (2 page(s), 12/22/1969)
- ML20128F066 - Requests written answers be provided to questions developed during discussions at meeting on 660218,for ACRS review. Lists specific questions which applicant should be prepared to discuss. (13 page(s), 2/23/1966)
- ML20128F190 - Forwards summary of Amends 5-18. (2 page(s), 11/17/1969)
- ML20128E913 - Discusses 651222 & 23 meeting w/plant in Bethesda,MD re "Design & Analysis Rept," submitted w/application for CP. Meeting attendees listed. (4 page(s), 1/4/1966)
- ML20125A965 - "Rept to Advisory Committee on Reactor Safeguards in Matter of Connecticut Light & Power Co-Preliminary Site Evaluation Millstone Point Reactor." (11 page(s), 6/21/1965)
- ML20128E860 - Forwards memo to files re facility meeting held in Bethesda, MD on 651222 & 23. (1 page(s), 1/4/1966)
- ML20128E997 - "Adequacy of Structural Criteria for Millstone Nuclear Power Station." (9 page(s), 2/11/1966)
- ML20125B006 - "Rept to ACRS in Matter of Connecticut Light & Power Co, Hartford Electric Light Co,Western Massachusetts Electric Co & Millstone Point Co as Participants in Millstone Nuclear Power Station." (40 page(s), 2/1/1966)
- ML20128F355 - "Adequacy of Structural Design for Millstone Nuclear Power Station Unit 1." (12 page(s), 12/4/1969)
- ML20128F246 - Provides rept w/annotations re facility.Concludes that facility can be operated w/o endangering health & safety of public flooding potential at site due to probable max hurricane & inservice insp program. (103 page(s), 11/24/1969)
- ML20125A437 - Forwards facility status rept,dtd 691229,for 700107 meeting. (4 page(s), 12/29/1969)
- ML20128F370 - Lists outstanding items from DRL rept on facility,691124, including review of plant procedures not complete,TS not finished,final stack emission limit not developed & emergency plan needs to be developed for incident. (2 page(s), 12/8/1969)
- ML20128F283 - Forwards Coastal Engineering Research Ctr ltr dtd 691204, furnishing comments on proposed operation of facility for review. (1 page(s), 12/8/1969)
- ML20125A419 - Forwards suppl rept,dtd 691224,providing addl info on certain matters described in 691124 SE of proposed operation of facility,for review. (1 page(s), 12/23/1969)
- ML20128F095 - Forwards rept for use in preparation for 691120 site visit. (3 page(s), 11/12/1969)
- ML20128F091 - Lists agenda for facility site visit on 691120.Recommends applicant give 5-10 minute presentation on listed subjects including current population distribution & growth trends, hurricane & floods & emergency power sys. (1 page(s), 11/12/1969)
- ML20128E931 - Forwards request for addl info re application for CP dtd 651110. (9 page(s), 1/14/1966)
- ML20128F339 - Forwards rept to AEC Regulatory Staff on Adequacy of Structural Design for facility,by Newmark & Hall,dtd 691204, for review. (1 page(s), 12/8/1969)
- ML20125A429 - Provides suppl rept to ACRS re facility SE on 691124, discussing matters including site flooding,inservice insp, seismic design adequacy,instrumentation & control items & turbine bldg secondary closed cooling water sys. (9 page(s), 12/24/1969)
- ML20128F017 - Lists ACRS questions re Brookwood & Millstone Point Reactor Pressure Vessels to be discussed at forthcoming Subcommittee meetings. (2 page(s), 2/17/1966)