Home > NRC Library > ADAMS Public Documents
Forwards proposed OL Change Request 198 to License DPR-66, incorporating temporary license condition to extend certain TS 18-month surveillance intervals to coincide w/ninth refueling outage.
Accession Number: ML20118A284
Date Released: Monday, May 11, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20118A283 - Forwards proposed OL Change Request 198 to License DPR-66, incorporating temporary license condition to extend certain TS 18-month surveillance intervals to coincide w/ninth refueling outage. (1 page(s), 8/18/1992)
- ML20118A285 - Proposed OL Change Request 198 to License DPR-66, incorporating temporary license condition to extend certain TS 18-month surveillance intervals to coincide w/ninth refueling outage. (6 page(s), 8/18/1992)
- ML20118A286 - Proposed TS for OL License Change 198,extending TS surveillances for TS 4.3.1.1.1,Table 4.3-1,TS 4.3.1.1.3, Table 3.3-2,TS 4.3.2.1.1,Table 4.3-2 & TS 4.3.2.1.3,Table 3.3-5 for reactor trip sys,ESFAS & channel calibr. (5 page(s), 8/18/1992)