Home > NRC Library > ADAMS Public Documents
Correction to Board notification 91-006,inserting encls, including TE Murley 910829 memo,to 910912 Board Notification 91-06.
Accession Number: ML20117P914
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20118B787 - Correction to Board notification 91-006,inserting encls, including TE Murley 910829 memo,to 910912 Board Notification 91-06. (1 page(s), 10/9/1991)
- ML20118B795 - Advises of review of TG Dunning issues re safety issue on onsite power to support RHR operation during plant shutdown, per 910628 memo.Risk not large enough to warrant immediate action. (1 page(s), 7/19/1991)
- ML20117Q124 - Provides comments on differing prof view re Tech Spec requirements for RHR sys during shutdown reflected in conclusions of plant IIT. (24 page(s), 8/16/1991)
- ML20117P920 - Recommends listed definition for operable-operability for new STS for GE,C-E & B&W plants. (4 page(s), 2/2/1989)
- ML20117P913 - Recommends that operable-operability definition in Tech Spec 1.25 be revised as listed,per 881019 request. (2 page(s), 1/6/1989)
- ML20118B804 - Requests assistance w/TS interpretations encountered during facility insp,including stated pump operability. (3 page(s), 10/27/1988)
- ML20117Q125 - Discusses Tech Specs allowing electrical configuration supplying power to operable ECCS pumps in cold shutdown.Tech Specs do not require that at least one ECCS subsystem be powered by operable onsite ac electrical power source. (2 page(s), 10/19/1988)
- ML20117Q126 - Responds to 910719 memo requesting comments on subj differing professional view re tech spec requirements for residual heat removal sys during shutdown conditions. (5 page(s), 8/19/1991)
- ML20118B809 - Forwards addl views re RHR operability requirements during plant shutdown.Recommended legal opinions listed. (3 page(s), 8/27/1991)
- ML20118B812 - Forwards summary of TS requirements for RHR & electrical power sources during shutdown conditions for BWRs. (3 page(s), 8/28/1991)