NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards interim procedures to bring plant to hot shutdown given fire in main control room on remote shutdown panels & charging pump room heatup analysis,per 850403 meeting.

Accession Number: ML20117K385

Date Released: Sunday, October 27, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer