NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 0 to NFU-145, "COLR Hope Creek Generating Station,Cycle 5/Reload 4." Specific core operating limits, contained in rept,determined using NRC-approved methodology.

Accession Number: ML20115H287

Date Released: Friday, May 8, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer