NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards marked-up proof & review combined TS,removing allowance to perform containment integrated leakage rates at reduced pressure.Reduced pressure testing will not be performed during Unit 2 preoperational testing.

Accession Number: ML20114B114

Date Released: Thursday, May 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer