Home > NRC Library > ADAMS Public Documents
Response to FOIA 840508 request for documents re Sandia Natl Lab "Analysis of Truck Bomb Threats at Nuclear Facilities." Documents listed in App A available in PDR.Sandia study undergoing declassification review.
Accession Number: ML20114A485
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20114A482 - Response to FOIA 840508 request for documents re Sandia Natl Lab "Analysis of Truck Bomb Threats at Nuclear Facilities." Documents listed in App A available in PDR.Sandia study undergoing declassification review. (3 page(s), 6/12/1984)
- ML20114A501 - Requests issuance of info notice re design basis threat & review of vehicle access controls.Draft notice suggesting that licensees review current provisions for physical protection encl. (3 page(s), 1/19/1984)
- ML20114A554 - Requests extension of review to embrace possibility of sabotage/bombing of water intake sys employed at some shore reactor installations in addition to consequence study of sabotage study at reactor sites. (1 page(s), 12/30/1983)
- ML20114A527 - Forwards draft paper,addressing point of protection of design basis vehicle description from public disclosure. Precise description of vehicle should be treated as confidential natl security info. (5 page(s), 4/3/1984)
- ML20114A543 - Requests input for NRC project to determine potential vulnerabilities of nuclear facilities against truck bomb similar to recent Lebanon incidents. (1 page(s), 12/28/1983)
- ML20114A509 - Requests development of immediately effective rule revising design basis threat for both radiological sabotage & theft to include introduction by adversary of explosives & other equipment by vehicle onto facility. (1 page(s), 1/27/1984)
- ML20114A636 - Advises that NMSS initiated action to revise 10CFR73 to require licensees to develop protective measures against introduction of explosives & other equipment by vehicle to power plants & Category I fuel cycle facilities. (1 page(s), 1/27/1984)
- ML20114A535 - Responds to 840214 ltr to Commissioner Gilinsky re potential use of vehicle bombs by terrorists against nuclear activities or facilities.NRC will propose changes in regulatory requirements. (1 page(s), 4/9/1984)
- ML20114A605 - Forwards info re initial costing background associated w/ concrete temporary embankments. (1 page(s), 12/23/1983)
- ML20114A645 - Advises that Ofc of Congressional Affairs scheduled 840306 briefing for Udell.Info requested re status of insider rule & how requirements would be implemented by licensee & recent IE info notice concerning truck bombing. (1 page(s), 2/24/1984)
- ML20114A638 - Informs of Davis request for short briefing on 840206 to present data re attack on commercial nuclear facility by vehicle. (5 page(s), 2/3/1984)
- ML20114A582 - Discusses design basis threat in interest of confirming decisions reached orally.Research initiatives underway to identify strategies to protect facilities. (3 page(s), 4/26/1984)
- ML20114A565 - Forwards draft statement of work for mod of RES project re investigation of vehicle obstacles for nuclear facilities, for completion of three required tasks within 45 days.Draft final rept requested by 840415. (4 page(s), 2/16/1984)
- ML20114A623 - Notifies of attempt to establish approx cost ranges for concrete barriers for various facilities to protect against large vehicles.Specific facilities looked at to refine figures & came up w/rough industry-wide cost ranges. (1 page(s), 12/22/1983)
- ML20114A522 - Forwards schedule for developing vehicle obstacle requirements for power reactors & fuel facilities,in response to 840127 memo re design basis threat/vehicle obstacle rulemaking. (2 page(s), 2/6/1984)
- ML20114A648 - Summarizes 840306 meeting w/Udell re various aspects of safeguards program. (3 page(s), 3/8/1984)
- ML20114A592 - Requests completion of three required tasks indicated in encl statement of work re investigation of truck bomb threat at nuclear facilities within 30 days.Draft final rept required by Apr 1984. (6 page(s), 12/31/1983)