NRC Logo

Home > NRC Library > ADAMS Public Documents

Explains why 12 h verification surveillance of 69 kV switchyard bus called for in Item a.5 of Tech Spec 4.13.1.1.2 not required.One oversize drawing encl.Aperture card available in PDR.

Accession Number: ML20113H383

Date Released: Wednesday, September 30, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer