Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for 12 separate categories of documents re Kerr-McGee Cushing U & thorium facilities. Documents requested in Items 1-7 & 10 not located.Documents for Items 8,9 & 11 listed in App A encl.
Accession Number: ML20113D035
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20113D032 - Responds to FOIA request for 12 separate categories of documents re Kerr-McGee Cushing U & thorium facilities. Documents requested in Items 1-7 & 10 not located.Documents for Items 8,9 & 11 listed in App A encl. (2 page(s), 6/19/1984)
- ML20113D070 - Insp rept on 640810-11.Noncompliance noted:excess hydrogen used in conversion of ammonium diuranate to U dioxide not ignited by flame,but allowed to vent unburned into exhaust sys. (10 page(s), 9/2/1964)
- ML20113D134 - Compliance insp rept from insp on 650126-27 & 0202-03.No noncompliance noted.Major areas inspected:scope of operation,facilities & subcontracts. (9 page(s), 2/16/1965)
- ML20113D157 - Forwards Part 70 insp rept from insp on 650126-27.No noncompliance noted. (1 page(s), 2/4/1965)
- ML20113D042 - Discusses insp of License SNM-695 on 640810-11.Noncompliance noted:pilot light in furnace used to burn off gases not lit & in-process matls stored in 1-gallon bottles on floor of bldg.Response requested within 20 days. (2 page(s), 10/16/1964)
- ML20113D098 - Compliance investigation rept re 650623 fire & rapid oxidation.Noncompliance noted:AEC not immediately notified of event. (13 page(s), 7/9/1965)
- ML20113D174 - Part 70 insp rept from insp on 650908.No noncompliance noted.Major areas inspected:radiological & nuclear safety programs & practices. (4 page(s), 9/21/1965)
- ML20113D057 - Forwards insp rept from insp on 640810-11 for appropriate action.Item of noncompliance re vendor use of hydrogen gas in processing area discussed.NRC suggestions for increased safety of operations listed. (1 page(s), 9/11/1964)
- ML20113D123 - Forwards compliance insp rept from insp on 650126-27 & 0202- 03.No noncompliance noted. (2 page(s), 2/16/1965)
- ML20113D171 - Part 70 insp rept from insp on 650126-27.No noncompliance noted.Major areas inspected:nuclear safety program, organization & Cushing operations. (6 page(s), 2/4/1965)
- ML20113D109 - Forwards Part 70 insp rept from insp on 650908.No noncompliance noted. (1 page(s), 10/1/1965)
- ML20113D084 - Compliance insp rept from insp on 640122-23 & 0305. Noncompliance noted:AEC not informed 10 days prior to start of machining operations & dry source matl transferred in hood not equipped w/absolute filter. (21 page(s), 4/8/1964)