NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "CPSES Unit 2 Cycle 3 Startup Rept." Facility achieved criticality for Cycle 3 on 960506.Cycle 3 contains first batch of Siemens Power Corp (SPC) fuel for Unit 2.Encl describes SPC fuel nuclear & mechanical design parameters.

Accession Number: ML20112G401

Date Released: Tuesday, May 5, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer