Home > NRC Library > ADAMS Public Documents
Forwards preliminary case study rept, "Overpressurization of ECCS in BWRs." Eight events entailing failure of testable isolation check valve on ECCS injection line evaluated. Comments requested within 30 days of receipt.
Accession Number: ML20111D046
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20111D043 - Forwards preliminary case study rept, "Overpressurization of ECCS in BWRs." Eight events entailing failure of testable isolation check valve on ECCS injection line evaluated. Comments requested within 30 days of receipt. (2 page(s), 3/7/1985)
- ML20111D086 - Forwards preliminary case study rept, "Overpressurization of ECCS in BWRs." Eight events entailing failure of testable isolation check valve on ECCS injection line evaluated. Comments requested within 30 days of receipt. (2 page(s), 3/7/1985)
- ML20111D102 - Forwards preliminary case study rept, "Overpressurization of ECCS in BWRs." Eight events entailing failure of testable isolation check valve on ECCS injection line evaluated. Comments requested within 30 days of receipt. (2 page(s), 3/7/1985)
- ML20111D114 - Forwards preliminary case study rept, "Overpressurization of ECCS in BWRs." Eight events entailing failure of testable isolation check valve on ECCS injection line evaluated. Comments requested within 30 days of receipt. (2 page(s), 3/7/1985)
- ML20111D125 - "Overpressurization of ECCS in BWRs," preliminary case study rept. (45 page(s), 2/28/1985)