NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards marked-up TS,revising proposed extended DG AOT to 14 days from discovery of failure to meet LCO,provided standby auxiliary transformer available,in response to NRC RAI.

Accession Number: ML20111A528

Date Released: Monday, May 4, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer