Home > NRC Library > ADAMS Public Documents
Forwards Vols 1-4 of "Completion Rept for Reclamation of Bluewater Mill Site."
Accession Number: ML20108D878
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20108D876 - Forwards Vols 1-4 of "Completion Rept for Reclamation of Bluewater Mill Site." (2 page(s), 4/30/1996)
- ML20266D858 - CARBONATE TAILINGS PILE SUBGRADE SURFACE AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D885 - ORE STOCKPILE AREA SUBGRADE AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D842 - MAIN TAILINGS PILE RADON BARRIER AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D818 - MAIN TAILINGS RADON BARRIER AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D800 - MAIN TAILINGS PILE SUBGRADE SURFACE AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D905 - NORTH & SOUTH LANDFILLS AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D822 - MAIN TAILINGS PILE RADON BARRIER AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D775 - MAIN TAILINGS PILE DEPTH OF RADON BARRIER. (1 page(s), 3/31/1996)
- ML20266D881 - ORE STOCKPILE AREA DEPTH OF FILL. (1 page(s), 3/31/1996)
- ML20266D896 - RECLAIMED PLANT SITE SUBGRADE AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D844 - MAIN TAILINGS PILE CROSS SECTIONS. (1 page(s), 3/31/1996)
- ML20108D897 - Vols 1-4 of "Completion Rept for Reclamation of Bluewater Mill Site." W/45 oversize drawings. (1696 page(s), 3/31/1996)
- ML20266D765 - MAIN TAILINGS PILE DEPTH OF RADON BARRIER. (1 page(s), 3/31/1996)
- ML20266D848 - MAIN TAILINGS PILE CROSS SECTIONS. (1 page(s), 3/31/1996)
- ML20266D797 - MAIN TAILINGS PILE SUBGRADE SURFACE AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D888 - ORE STOCKPILE AREA FINISHED GROUND AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D808 - MAIN TAILINGS PILE SUBGRADE SURFACE AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D853 - CARBONATE TAILINGS PILE DEPTH OF RADON BARRIER. (1 page(s), 3/31/1996)
- ML20266D867 - CARBONATE TAILINGS PILE CROSS SECTIONS. (1 page(s), 3/31/1996)
- ML20266D902 - RECLAIMED PLANT SITE FINAL CONFIGURATION. (1 page(s), 3/31/1996)
- ML20266D783 - MAIN TAILINGS PILE DEPTH OF RADON BARRIER. (1 page(s), 3/31/1996)
- ML20266D792 - MAIN TAILINGS PILE SUBGRADE SURFACE AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D878 - FORMER EVAPORATION PONDS FINAL CONFIGURATION. (1 page(s), 3/31/1996)
- ML20266D837 - MAIN TAILINGS PILE RADON BARRIER AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D873 - FORMER EVAPORATION PONDS FINAL CONFIGURATION. (1 page(s), 3/31/1996)
- ML20266D769 - MAIN TAILINGS PILE DEPTH OF RADON BARRIER. (1 page(s), 3/31/1996)
- ML20266D832 - MAIN TAILINGS PILE RADON BARRIER AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D788 - MAIN TAILINGS PILE DEPTH OF RADON BARRIER. (1 page(s), 3/31/1996)
- ML20266D827 - MAIN TAILINGS PILE RADON BARRIER AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D891 - RECLAIMED PLANT SITE DEPTH OF FILL. (1 page(s), 3/31/1996)
- ML20266D861 - CARBONATE TAILINGS PILE RADON BARRIER AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D813 - MAIN TAILINGS PILE SUBGRADE SURFACE AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D803 - MAIN TAILINGS PILE SUBGRADE SURFACE AS-BUILT. (1 page(s), 3/31/1996)
- ML20266D778 - MAIN TAILINGS PILE DEPTH OF RADON BARRIER. (1 page(s), 3/31/1996)