Home > NRC Library > ADAMS Public Documents
Forwards four copies of final Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings Site at Lakeview,Oregon,including original signature page & summary of minor changes.
Accession Number: ML20105D228
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20105D227 - Forwards four copies of final Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings Site at Lakeview,Oregon,including original signature page & summary of minor changes. (1 page(s), 8/19/1992)
- ML20105D263 - Final "Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings Site at Lakeview,Oregon," Vol I-Text & Appendices A through D.UMTRA-DOE/AL-050510.0000,rev 1 is entire rept number. (181 page(s), 7/31/1992)
- ML20105D269 - Final "Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings Site at Lakeview,Oregon," Vol II-Appendices E through G.UMTRA-DOE/AL-050510.0000,Rev 1 is entire rept number. (412 page(s), 7/31/1992)
- ML20105D279 - Final "Remedial Action PLan & Site Design for Stabilization of Inactive U Mill Tailings Site at Lakeview,Oregon," Vol III-Attachments A & B to Appendix F.UMTRA-DOE/AL-050510.0000 rev 1 is entire rept number. (460 page(s), 7/31/1992)