Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for documents re Board Notification 84-062 & license amend applications for single loop operation.Forwards App A & B documents.Documents in PDR.App C documents withheld (ref FOIA Exemption 5).
Accession Number: ML20100Q541
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20100Q538 - Partial response to FOIA request for documents re Board Notification 84-062 & license amend applications for single loop operation.Forwards App A & B documents.Documents in PDR.App C documents withheld (ref FOIA Exemption 5). (6 page(s), 6/25/1984)
- ML20105D026 - Forwards Instrumentation & Control Sys Branch comments re proposed Tech Spec changes for plant operation w/loop out- of-svc.Comments should be used as agenda for further discussions w/licensee. (1 page(s), 3/19/1984)
- ML20105C754 - Informs that Div of Sys Integration safety evaluation of N-1 loop operation,Multi-Plant Action E-05 expected by 840331. (1 page(s), 1/26/1984)
- ML20100Q675 - Forwards chronology of events for N-1 loop operation. (2 page(s), 4/6/1983)
- ML20100Q694 - Advises that target date re N-1 loop operation changed to 821231 to accommodate licensee delayed response to Reactor Sys Branch questions. (1 page(s), 9/28/1982)
- ML20105C195 - Forwards questions for proposed N-1 loop operation,as part of secondary review.Primary reviewer is Reactor Sys Branch. (3 page(s), 8/24/1983)
- ML20105B770 - Forwards request for addl info re steam generator tube ruptures during N-1 loop operation for transmittal to licensee. (3 page(s), 5/20/1983)
- ML20105B383 - Forwards request for addl info re accident analysis for N-1 loop operation,required to complete review of License Amend Request 35 for two-loop operation.Applicant response requested by 820913. (3 page(s), 8/12/1982)
- ML20100Q570 - Notifies of 840319 meeting to discuss facility N-1 loop operation. (12 page(s), 3/9/1984)
- ML20100Q649 - Initial NSHC determination & noticing action re util 781027 application for amend to License DPR-66,allowing operation of two coolant loops when needed.Three units required during power operation. (3 page(s), 8/4/1983)
- ML20105B391 - Forwards Operating Reactors Analysis Branch safety evaluation re N-1 loop operation.Reactor Sys Branch review ongoing.Div requested to review need to make control room indicators.W/o encl. (1 page(s), 8/10/1982)