Home > NRC Library > ADAMS Public Documents
Final response to FOIA request for NUREG-0862 investigation. Forwards App A documents.Portions of listed App A documents completely & partially withheld (ref FOIA Exemption 5). Documents also available in PDR.
Accession Number: ML20100L849
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20100L845 - Final response to FOIA request for NUREG-0862 investigation. Forwards App A documents.Portions of listed App A documents completely & partially withheld (ref FOIA Exemption 5). Documents also available in PDR. (6 page(s), 6/4/1984)
- ML20100M187 - Forwards further Commissioner Palladino remarks re facility enforcement matter. (2 page(s), 3/2/1982)
- ML20100M085 - Forwards review of RL Cloud Assoc,Inc final draft of "Preliminary Rept,Seismic Reverification Program." (93 page(s), 1/21/1982)
- ML20100M047 - Draft preliminary rept of Project 105-4, "Seismic Reverification Program." (80 page(s), 11/12/1981)
- ML20100M133 - Informs that completion of Phase I of design reverification program expected by 820201.Comments should be provided to PG&E as early as possible to coordinate plan between Region 5,NRR & IE to follow aspects of Commission plan. (11 page(s), 12/31/1981)
- ML20100M203 - Submits review of investigation reported in NUREG-0862, which consisted of one phase re testimony of PG&E employees, RL Cloud employees & AB Norton,atty to PG&E & second phase re PG&E comment on RL Cloud draft submittals. (6 page(s), 6/4/1984)
- ML20105B081 - Forwards draft of "Preliminary Rept,Seismic Reverification Program," prepared by RL Cloud Associates,Inc. (1 page(s), 11/18/1981)
- ML20100M241 - Marked-up sanitized transcript of 811222 closed meeting in Washington,DC re Exemption 5 briefing on investigation & proposed enforcement action.Pp 1-126. (27 page(s), 12/22/1981)
- ML20100L956 - Forwards addl matl re design interface review of seismic reverification program. (450 page(s), 12/16/1981)
- ML20100L993 - Forwards portions of RV Bettinger notes from 811105-06 & 13 meetings re Cloud verification program. (4 page(s), 1/11/1982)