NRC Logo

Home > NRC Library > ADAMS Public Documents

Application for amend to license NPF-62,changing TS 3.3.4.1, "End of Cycle Recirculation Pump Trip Instrumentation," to delete SR 3.3.4.1.6 which requires RPT breaker interruption time to be determined at least once per 60 months.

Accession Number: ML20100H836

Date Released: Thursday, April 23, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer